| Location: | Georgia |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Aug 24, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66062-NONST-2027-000000465 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66062-NONST-2027-000000465 | IFB/CS/DOA/2608-1270017/Central PC Air Replacement - Phase 2 at H-JAIA | Atlanta, City Of |
Aug 10, 2026 @ 03:18 PM
|
Aug 24, 2026 @ 02:00 PM
|
Start Date: Aug 10, 2026 @ 03:18 PM ET
End Date:
Aug 24, 2026 @ 02:00 PM ET
The Central PC Air Replacement ¿ Phase 2 project will replace and modernize the aging centralized pre-conditioned air systems serving Concourses B and E at the airport. The work includes replacing major mechanical equipment, upgrading distribution piping and controls, improving supporting electrical, plumbing, fire protection, and life-safety systems, and expanding the infrastructure to support current and future aircraft gate configurations. Construction will occur primarily during overnight hours within the Aircraft Operations Area (AOA) and will require extensive coordination with the Department of Aviation and airline stakeholders to minimize disruptions to airport operations.
All responses must be submitted electronically through the City of Atlanta's Supplier Portal (https://www.atlsuppliers.com/). Submissions made outside the Supplier Portal will not be accepted. To view solicitation details and submit a response, you must be a registered supplier and logged into the Portal. For supplier registration visit https://ehxr.fa.us2.oraclecloud.com/fscmUI/redwood/supplier-registration/register-supplier/register-supplier-verification
| Code | Description |
| 91017 | Energy Computerized Control System, HVAC, Lighting, Utilities, etc., Installation, Maintenance and R |
| 03502 | Air Conditioning Units, Aircraft, Cooling Interiors While at the Gate |
| 92507 | Air Conditioning ,Heating and Ventilating Engineering |
| 91450 | Heating, Ventilating and Air Conditioning (HVAC) |
| 91036 | Heating, Air Conditioning, and Ventilation Maintenance, Repair and Installation Services |
Todd Stratton
gtstratton@atlantaga.gov
770-833-0184

With GovernmentContracts, you can:
...and Microbe Control Chemicals, Air Conditioning and Cooling Water 88515 Algae and Microbe ...
State Government of Georgia
Bid Due: 10/30/2026
...Air Conditioning ,Heating and Ventilating Engineering 92830 Cooling, Heating, and Ventilating...
State Government of Georgia
Bid Due: 10/09/2026
.... NIGP Codes Code Description 03124 Controls, Cooling Tower Water Treatment: pH, Conductivity..., ...
State Government of Georgia
Bid Due: 10/22/2026
...: Automatic Transmissions, Cooling Systems, Power Steering Systems 07546 Lubrication Equipment: Guns...
State Government of Georgia
Bid Due: 9/30/2026