| Location: | Georgia |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66276-NONST-2027-000000027 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66276-NONST-2027-000000027 | City of Social Circle Little River Water Pollution Control Plant | Social Circle, City Of |
Aug 10, 2026 @ 08:10 AM
|
Sep 17, 2026 @ 02:30 PM
|
Start Date: Aug 10, 2026 @ 08:10 AM ET
End Date:
Sep 17, 2026 @ 02:30 PM ET
Contract 1: Sewerage System Improvements installing approximately 3,600
linear feet of DIP and PVC sewer including manholes, jack and bore, rock
excavation, clearing, soil erosion and sediment control, and appurtenances.
Time allotted for construction 270 consecutive calendar days.
Contract 2: Little River Water Pollution Control Plant to include a screen and
grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters,
ultraviolet disinfection unit, sludge pump station, plant pump station, chemical
feed facilities, control building, digester and sludge dewatering building, all
complete with appurtenances. Time allotted for construction is 480
consecutive calendar days and 540 days for final completion.
| Code | Description |
| 93462 | Pipe and Pipe Fittings Maintenance and Repair |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
Alicia Addenbrook
aaddenbrook@turnipseed.com
706-863-8800

With GovernmentContracts, you can:
...26-173 Chafee Lift Station Pumps Available Date: 9/9/2026 Due Date: 10/15/2026 no later ...
https://www.augustaga.gov/
Bid Due: 10/15/2026
...26-173 Chafee Lift Station Pumps Augusta, City Of Sep 10, 2026 @ 07:59 ...
State Government of Georgia
Bid Due: 10/15/2026
...Project: REMOVAL & INSTALLATION OF (2) 750 GPM VERTICAL TURBINE PUMPS MORGAN DAIRY ...
Floyd County
Bid Due: 9/21/2026
...26-025 REMOVAL & INSTALLATION OF (2) 500 GPM VERTICAL TURBINE PUMPS BURNETT FERRY ...
State Government of Georgia
Bid Due: 9/21/2026