New Airport Traffic Control Tower at Kissimmee Gateway Airport

Location: Florida
Posted: Mar 15, 2026
Due: Apr 14, 2026
Agency: Polk County Public Schools Facilities and Operations
Type of Government: State & Local
Category:
  • N - Installation of Equipment
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFP2026011
Publication URL: To access bid details, please log in.
Main

Agency
City of Kissimmee
Status
Active
Fiscal Year
2026
Primary Contact
Debbie Luke
Title
New Airport Traffic Control Tower at Kissimmee Gateway Airport
Secondary Contact

Number
RFP2026011
Tertiary Contact

Type
Request for Proposal
Department
Purchasing
Online Submissions
No
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services

Notice is hereby given that sealed bids for NEW AIRPORT TRAFFIC CONTROL TOWER will be received at the Kissimmee Gateway Airport, Kissimmee, Florida until 2:00 p.m. local time on Tuesday April 14, 2026 at which time bids will be publicly opened and read aloud at the Kissimmee Gateway Airport, 401 Dyer Boulevard, Kissimmee, Florida 34741, office of the Director of Aviation.
Project Title
NEW AIRPORT TRAFFIC CONTROL TOWER AND SITE WORK
Project Description
The description of the proposed work includes but is not limited to the following:
This project consists of the construction of a New Airport Traffic Control Tower and associated site work, including but not limited to, tower shaft and connected annex building structures, foundations, components, cladding, fire protection equipment, plumbing and mechanical equipment, electrical supply and equipment, FAA equipment, Cab equipment, glazing, wayfinding, specialty equipment, roofing, parapets, catwalks, fiber optics and power supply, hot and cold water supply and sewerage, interiors, technology equipment, ceilings, radio equipment, surveillance equipment, access controls, earthworks, storm drainage, support utilities, electrical vault work, and utility\owner coordination, FAA coordination, SWPPP, civil demolitions, concrete sidewalks, parking lots, asphalt pavements, concrete curb and gutters, marking and striping, signage, construction survey, mobilization, dewatering, foundation drains, construction permits, and all labor, incidentals, equipment, bonds and insurance necessary for the complete works as detailed in this project manual \ full set of contract documents. The contract documents include the project manual, construction plans, and all referenced standards, specifications, and other requirements therein.
…… pursuant to all applicable codes, FAA/FDOT standards, and the available project budget funds. The work may be divided into multiple bid schedules
Submit one (1) original and one (1) hardcopy, together with a USB drive, CD, or DVD with a scan of your entire signed complete bid price proposal, by the closing date and time in a sealed envelope with the bid title, FAA AIP and FDOT FM numbers clearly marked on the outside of the envelope. Bids received after the closing date and time will not be considered and will be returned to the bidder.

After Monday, March 16, 2026, Bid Documents will be available electronically at no charge and may be obtained by contacting Sue Finney, Email: sfinney@avconinc.com Phone: (407) 599-1122. Hard copies will not be provided.
Bidders must be registered through AVCON, INC. to be eligible to submit a Bid for the project. A complete examination of the site and understanding of the drawings and specifications contained in the Bid Documents is necessary in order for the Bidder to properly submit a Bid. The Bid Documents also include a detailed set of Instructions to Bidders. All Bids shall be prepared in accordance with the Instructions to Bidders. The failure to comply with any requirement contained in the Bid Documents may result in the rejection of the Bid as non-responsive or a finding that the Bidder is not qualified for this Project.
All questions regarding Bid Documents should be addressed to AVCON, INC., attention Sue Finney at sfinney@avconinc.com. Do not contact the Airport or the City. The deadline for questions is Tuesday, April 7, 2026 at 5 pm Eastern. The final Addendum will be issued not later than Thursday April 9, 2026, 5 pm Eastern, as necessary. A site visit meeting will be held tentatively Thursday March 26, 2026 @ 10 AM. Please meet at Airport Admin Building located at 401 Dyer Boulevard, Kissimmee, FL 34741.
Bids must be submitted on an exact reproduction of the bid forms supplied, including any addenda which may be issued, in sealed envelopes plainly marked with the FAA AIP and FDOT Financial Management Numbers and Project Title in bold as specified above.
Each bid must be accompanied by a cashier`s check or by a Bid Bond in the amount of five (5) percent of the Total Bid Price, to include all alternates.
If awarded the Contract, the Contractor shall provide a Performance Bond and Payment Bond satisfactory to the Owner, each to be in a sum of at least equal to the Total Bid Price.
The Owner reserves the right to waive any informalities or technicalities, to reject any or all Bids, or to re-advertise for Bids. Award, if made, will be to the responsible and qualified Bidder whose Bid is responsive to the invitation and is most advantageous to the Owner, price and other factors considered.
Liquidated damages for delay in completion of the contract will be in accordance with the Contract Documents. No Bid may be withdrawn after the scheduled Bid Closing time for a period of one hundred eighty (180) days.
Based on recent Executive Orders by the White House, DBE requirements have been temporarily suspended for this project. Bidders are required to supply a listing of all suppliers and contractors, without regard to any DBE status.


The proposed contract is subject to the Buy American provisions under Section 9129 of the Aviation Safety and Capacity Expansion Act of 1990 and Title 49 U.S.C., Chapter 501. Details of such requirements are contained in the Contract Documents. The Contract is subject to the regulations and orders of the Secretary of Labor, OFCCP and FAR 152.61 and requires notices numbered (1) through (4), which can be found in the Contract Documents.
The Federal Contract Provisions are made a part of this contract whether physically bound to it or not and are therefore incorporated by reference. The latest published version of the “Provisions for all Construction Contracts” shall govern. Bidders shall go to www.faa.gov for the latest information.
The FAA, along with other federal agencies, removed requirements for non-segregated facilities and EEO/affirmative action clauses following President Trump’s Executive Order 14173 ("Ending Illegal Discrimination and Restoring Merit-Based Opportunity"). This order revoked the 1965 Executive Order 11246, which previously mandated these provisions, to prioritize "merit-based" hiring and reduce administrative burdens on contractors.
Key Details Regarding the Removals:
•        Rationale: The changes aim to eliminate diversity, equity, and inclusion (DEI) policies from government contracts.

•        Action Taken: The Civilian Agency Acquisition Council (CAAC) authorized deviations from the Federal Acquisition Regulations (FAR), instructing agencies to stop enforcing provisions such as FAR 52.222-26 (Equal Opportunity) and FAR 52.222-21 (Prohibition of Segregated Facilities).

•        Impact on Contractors: Contractors are no longer required to adhere to specific, longstanding anti-segregation requirements for workplace facilities (e.g., dining areas, drinking fountains, housing) or to submit certain affirmative action reports.

•        Legal Standing: While the specific contract clauses are removed, contractors are still obligated to comply with general anti-discrimination laws under Title VII of the Civil Rights Act.
These changes were initiated through GSA Class Deviations in February 2025 to align with the new administration`s policies.

The Contract is subject to the State E-Verify requirements. On January 4, 2011, Governor Rick Scott signed Executive Order Number 11-02, which requires state agencies to require use of the Department of Homeland Security’s E-Verify system to verify employment eligibility of employees to work in the United States. The E-Verify requirement is mandated to be included in this Contract for the Contractor`s and subcontractor`s employees. Therefore, the Contractor agrees to use the E-Verify system and provide such compliance information as may be required by the City and/or the State of Florida.”
All questions should be addressed in writing to AVCON, INC. attention Sue Finney at sfinney@avconinc.com. Site visits may be scheduled during the bidding period by contacting the Director of Aviation prior to bidding a minimum 24 hours in advance. It will be the responsibility of the contractor to provide transportation for any site visit.
The apparent low bidder will be announced based on the Total Bid Price equaling the addition of all the Bid Schedules and Alternates (if any). The contract will be awarded to a successful bidder based on a review of all bids received on all bid schedules and alternates in accordance with the contract documents. Bid Schedules or Alternates may or may not be awarded depending upon the available grant funds. The Owner reserves the right to award any combination of Bid Schedules/Alternates, or to reject all Bid Schedules/Alternates, or to reject any combination of Bid Schedules/Alternates, which are most advantageous to the Owner, price and all other factors considered, and as specified in accordance with the Contract Documents. The apparent low bidder, therefore, may not be the successful bidder, depending on the actual Bid Schedules and/or Alternates awarded.
After bidding, but prior to award of a contract, the successful bidder will be required to provide a detailed Schedule of Values for all vertical construction items based on Divisional lump sum specifications in the provided bid schedule, and upon which the Total Bid Price has been based, for inspection by the Owner and Owner’s Representatives. This is in addition to any other information required by the contract documents prior to award. The Schedule of Values shall be first broken down into the Bid Schedules and Alternates (if any) main pay items. The Schedule of Values shall subsequently list all detailed line items for all of the construction components of the project with the associated dollar value the contractor has assigned to the line item, and generally based on the specifications. The Owner and Owner’s Representatives shall examine the Schedule of Values, and it shall be subject to their approval prior to award of the contract. The successful bidder shall provide as much detail as necessary for the Owner and Owner’s Representatives to adequately evaluate the Schedule of Values, in the Owner’s sole opinion. Subsequent pay applications by the Contractor will be based on a percentage of completion of the individual line items as completed and verified by the Owner. Such line items will also be used for inspection verification of quantities for payment.
Bidders shall submit a general one-year project warranty certificate on workmanship and labor for all work on this project, in addition to any product, equipment, and/or materials-specific manufacturer’s warranties required by FAA prior to final payment.
Materials Requirements: No existing materials currently stockpiled on Airport or City property are available for the project. Bidders are notified that all materials required for construction shall be brought in from off Airport property or taken from strictly within the project limits of specified work area only, pursuant to the plans and specifications. There are absolutely no stockpiled or other materials to be provided by the Airport for this project. All materials are to be provided by the Contractor. Any unsuitable or unused materials generated by the project shall be hauled off of Airport property and legally disposed or placed in designated areas as directed by the Airport and/or shown in the contract documents. The Airport shall have first right of refusal on all unused or excess materials. The Airport and Airport’s authorized representative shall solely determine what materials are unsuitable.
As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is OSCEOLA County.

Director of Aviation, Kissimmee Gateway Airport, Florida


Dates(All times are listed as EST )

Broadcast Date
3/15/2026 8:00 AM EST
Question End Date
4/7/2026 5:00 PM EST
Sample Due Date
Due Date
4/14/2026 2:00 PM EST
Bid Opening Date

Question End Date Reminder Notification
0 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
Due Date Reminder Notification
0 Day(s)
Pre-Bid Meetings

Total: 1 (All times are listed as EST )
Date Time Mandatory Location
3/26/2026 10:00 AM No Site Visit at Airport Admin Building located at 401 Dyer Boulevard, Kissimmee, FL 34741.
Shortlist Meeting

Total: 0 (All times are listed as EST )
Date Time Location
Documents

Total: 1
Type Name Description File Type
Request for Proposal Advertisement 241610202-Invite.pdf Advertisement PDF
Commodity Codes

Total: 2
Code Description
[940-85] Tower Construction
[909-10] Airport Facility Construction
Publications

Total: 1
Publication Date
Orland Sentinel 3/15/2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Intelligent Transportation System (I.T.S) - Fiber Optic Network (Repair, Replace, and Construction Public... ...

Orange County

Bid Due: 6/18/2026

...Description: RPQ FIBER OPTIC CABLE, PURCHASE AND DELIVERY, TERM CONTRACT Department: Facilities... for ...

Palm Beach County

Bid Due: 7/06/2030

...Description: FIBER OPTIC ENGINEERING, DESIGN, MATERIAL, SUPPLIES & INSTAL Department... for Prequalifications (RPQ) ...

Palm Beach County

Bid Due: 1/06/2030

...with fiber optic communication including the placement of concrete strain poles at the ...

Hernando County

Bid Due: 6/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.