| Location: | Pennsylvania |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Aug 31, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Austin Borough, Potter County |
| Publication URL: | To access bid details, please log in. |
Project Description: The project includes the following work to be performed by the contractor, including all equipment, labor and materials required for the completion of the work. All materials shall be from PennDOT approved suppliers currently listed on Bulletin 15. All contractors shall be PennDOT pre-approved:
Garretson Street Bridge Rehabilitation
1. Install traffic control measures and all E&S Bmps.
2. Perfom excavation of the existing roadway within the limits shown on the drawings.
3. Remove existing bridge waterproofing membrane.
4. Install new bridge waterproofing membrane.
5. Install new roadway subbase.
6. Install new asphalt.
7. Restore / stabilize all disturbed areas and remove all of the erosion and sedimentation control devices.

With GovernmentContracts, you can:
...quantities are: Mobilization and Demobilization. 1 L.S. Implementation of the Erosion and Sediment ...
State Government of Pennsylvania
Bid Due: 9/24/2026
...associated erosion and sedimentation controls. Bids will be received online via PennBid until ...
PennBid
Bid Due: 10/05/2026
...Township and install a precast culvert included but not limited to all associated ...
PennBid
Bid Due: 10/06/2026
...and State legal rights-of-way, and will involve restoration, erosion and sedimentation controls...
PennBid
Bid Due: 10/06/2026