Project Description: The work to be performed under this contract consists of all labor, equipment, and materials necessary to decommission and demolish the existing Easton Road Pump Station and install two insertion valves and one gate valve near the Easton Road Pump Station, all located in Horsham Township, Montgomery County, PA. The scope of work includes, but is not limited to, product removal, coordination with the Owner, demolition, site work, excavation, disposal, valve installation, and road restoration, as shown on the Drawings and described in the Specifications. All work is to be completed under a single lump sum contract.

With GovernmentContracts, you can:
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026
...Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
..., paving, lawn and concrete sidewalk restoration, installation of two Authority supplied simplex... ...
PennBid
Bid Due: 6/30/2026
...and its related components, and installation of a new hydraulic system with supporting ...
DEPT OF DEFENSE
Bid Due: 6/18/2026