| Location: | California |
|---|---|
| Posted: | Apr 9, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | City of American Canyon |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Green Island Road Reconstruction and Widening Project (TR16-0700)
Addenda: 1
Release Date: 2/19/2025
Due Date: 4/22/2025
Green Island Road Reconstruction and Widening Project (TR16-0700)
NOTICE IS HEREBY GIVEN that the CITY OF AMERICAN CANYON, STATE OF CALIFORNIA, will receive Contract Proposals up to the hour of 2:00 pm on Tuesday, April 22, 2025 through the City's procurement portal at https://procurement.opengov.com/portal/cityofamericancanyon or in person at the American Canyon City Hall located at 4381 Broadway, Second Floor. Proposals will be opened immediately thereafter, electronically and in person in the Council Chambers, and referred to the City Council for consideration at the next regularly scheduled meeting. For proposals submitted in person, the clock in the City Clerk's office will be used to make the official determination of the time bids are submitted.
Sealed proposals which will be submitted in person should be addressed as follows:
City Clerk
GREEN ISLAND ROAD RECONSTRUCTION AND WIDENING PROJECT
TR16-0700
City of American Canyon
4381 Broadway, Suite 201
American Canyon, California 94503
A non-mandatory pre-bid conference will be held in person at 1:30 pm on Monday, March 10, 2025 at City Council Chambers, 4381 Broadway, Suite 201, American Canyon, CA 94503 , followed by a field visit to the project site.
The project consists of the following general work:
BASE BID
1) Implementation of construction traffic controls
2) Implementation of storm water pollution protection
3) Earthwork
4) Installation of new sanitary sewer services and associated facilities
5) Installation of new and abandonment of existing water mains, and associated work on existing services and facilities, new services, and removal of existing fire hydrants and placement of new fire hydrants
6) Installation of new and modifications to existing storm drainage improvements, and bioretention facilities
7) Installation of new street lighting along Green Island Road within the project limits
8) Reconstruction of existing and installation of new curb, gutter and sidewalk improvements, including ADA ramps
9) Roadway rehabilitation (increasing the structural section to match respective increased design Traffic Indexes) of Green Island Road (including widening a portion), Jim Oswalt Way, Mezzetta Court, Commerce Boulevard, and Hanna Drive, via various methods including new paving, full reconstruction via remove and replace, and reconstruction via FDR-C treated base
10) Removal of existing and installation of new thermoplastic striping and markings, signage and other incidental work
11) Pavement and landscape restoration not limited to road repair, sidewalks, curbs, gutters and handicap ramps.
ADDITIVE ALTERNATIVE 1
12) New sidewalk along the east side of Commerce Boulevard, between North Slough and Green Island Road
ADDITIVE ALTERNATIVE 2
13) New sidewalk along the south side of Hanna Drive, between Commerce Boulevard and North Slough
The Engineer’s Estimate for the BASE BID project is $13,231,000.
The Engineer's Estimate for the ADDITIVE ALTERNATIVE 1 project is $109,300.
The Engineer's Estimate for the ADDITIVE ALTERNATIVE 2 project is $321,700.

With GovernmentContracts, you can:
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...control, demolition, earthwork and grading, minor concrete (curbs, sidewalks, and gutters) , AC ...
City of Turlock
Bid Due: 6/17/2026
...Qualifications: Class "A" - General Engineering or "C-12" - Earthwork and Paving Contractors ...
Tehachapi city
Bid Due: 6/09/2026
.... Typical work includes General Engineering, Earthwork, Landscaping, Electrical, Concrete, Paving, Plumbing...
Auburn city
Bid Due: 6/15/2026