Building 46 MEDCOM Renovations, Kalaeloa, Oahu, HIARNG

Location: Hawaii
Posted: Sep 5, 2026
Due: Sep 17, 2026
Agency: State Government of Hawaii
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: B27000144
Publication URL: To access bid details, please log in.

General Information

  • Line Items
  • Instructions
  • B27000144 Building 46 MEDCOM Renovations, Kalaeloa, Oahu, HIARNGGeneral InformationSolicitation Number
    B27000144 version:
    02
    Status
    ReleasedDepartmentDefenseDivisionHawaii Army National GuardIslands (where the work/delivery is to be performed)
    OahuCategoryConstructionRelease Date 07/31/2026Amendment Date & Time09/04/2026 11:30 PMAmendment Reason
    Provide clarification to bid documents and to answer questions submitted by prospective bidders.Offer Due Date & Time09/17/2026 02:00 PMDescriptionScope of Work is considered a full renovation of an existing 3-story CMU structure, which consists of, but is not limited to:

    - Demolishing abandoned/obsolete plumbing on all three floors;

    - Upgrading existing first floor restrooms and installing additional restrooms on second and third floors, including new showers and water bottle stations;

    - Replacing all roof systems and roof hatches;

    - Replacing all existing fixed partitions and ceilings in interior rooms and hallways;

    - Replacing existing central station air handling units with new VRF systems;

    - Replacing all existing HVAC ductwork and chilled water distribution systems;

    - Replacing all electrical systems including panels, wiring, receptacles, and lighting; and

    - Replacing all existing jalousie windows with fixed aluminum windows to match existing aluminum sliding windows.

    Contact PersonIshii, WadeEmail wade.t.ishii@hawaii.gov Phone808-369-3484General CommentsProcurement OfficerStephen F. LoganAttachments _CA 202505C Solicitation Packet B46 Medcom Renovations.pdf
    CA202505C Addendum 1.pdf
    Download All


    Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
    of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
    to this Solicitation), to: Ishii, Wade.

    B27000144 Building 46 MEDCOM Renovations, Kalaeloa, Oahu, HIARNGLine Items
    #
    Title
    Quantity
    Unit of Measure
    Commodity Code
    Code Table
    Commodity Code Description
    238210 Electrical contractors
    238310 Acoustical ceiling tile and panel installation
    238220 Mechanical contractors
    238120 Iron work, structural, contractors
    238350 Window installation
    238160 Roofing contractors
    GeneralQuantity1Unit of MeasureJOBTitleBase BidDescriptionAIR CONDITIONING SYSTEM IN ENTIRETY; PLUMBING SYSTEM IN ENTIRETY; ELECTRICAL INFRASTRUCTURE; AND ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL WORK WITHIN AREAS INDICATED ON DRAWINGS.Attachments

    Print
    Code Table
    Commodity Code Description
    238910 Interior demolition contractors
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 1Description1ST FLOOR ARCHITECTURAL DEMO AND NEW, UNLESS OTHERWISE INCLUDED IN BASE BIDAttachments

    Print
    Code Table
    Commodity Code Description
    238910 Demolition contractor
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 2Description2ND FLOOR ARCHITECTURAL DEMO AND NEW, UNLESS OTHERWISE INCLUDED IN BASE BID.Attachments

    Print
    Code Table
    Commodity Code Description
    238910 Demolition contractor
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 3Description3RD FLOOR ARCHITECTURAL DEMO AND NEW, UNLESS OTHERWISE INCLUDED IN BASE BIDAttachments

    Print
    Code Table
    Commodity Code Description
    238210 Lighting system installation
    238910 Demolition contractor
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 4DescriptionDEMO OF EXIST LIGHTING, INSTALLATION OF LED LIGHTSAttachments

    Print
    Code Table
    Commodity Code Description
    238210 Electrical contractors
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 5DescriptionELECTRICAL BRANCH CIRCUITING, UNLESS OTHERWISE INCLUDED IN BASE BID OR OTHER ADDITIVE ALTERNATESAttachments

    Print
    Code Table
    Commodity Code Description
    238210 Telecommunications equipment and wiring (except transmission line) installation contractors
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 6DescriptionTELECOMMUNICATIONSAttachments

    Print
    Code Table
    Commodity Code Description
    238160 Roofing contractors
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 7DescriptionROOF REPLACEMENTAttachments

    Print
    Code Table
    Commodity Code Description
    238290 Elevator installation
    GeneralQuantity1Unit of MeasureJOBTitleADDITIVE ALTERNATE 8DescriptionELEVATOR REPLACEMENTAttachments

    Print


    Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
    of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
    to this Solicitation), to: Ishii, Wade.

    B27000144 Building 46 MEDCOM Renovations, Kalaeloa, Oahu, HIARNGInstructions
    • COMPLIANCE AND DOCUMENTATION: Vendors are required to be compliant with all appropriate state and federal statutes. Proof of compliance is required through HCE or via paper documentation.
    • RESPONSE TO THIS SOLICITATION: Only responses submitted through HIePRO shall be considered for award.
    • ADDITIONAL FEES AND CHARGES: Vendors shall include all applicable fees, charges, surcharges, shipping/handling, delivery, or any other charges associated with this solicitation in the price submitted.
    • VENDOR NON-COMPLIANCE : NON-COMPLIANCE may result in a vendor not receiving an award, delay of payment, or cancellation of award. If the vendor does not maintain timely compliance, which is the vendor’s responsibility, an offer otherwise deemed responsive and responsible may not be awarded. State agencies may check for compliance at any time.
    • HAWAII GENERAL EXCISE TAX (GET): Unless otherwise stated in this solicitation, vendors shall include all applicable taxes in the price submitted. The Hawaii General Excise Tax (GET) shall not exceed 4.712% for the islands of Oahu, Kauai , Hawaii, and Maui.
    • TRANSACTION FEES: The awarded vendor shall pay a transaction fee of 0.75% (.0075) of the award, not to exceed $5,000 for each award. This transaction fee shall be based on the original award amount and the awarded vendor shall be responsible for payment of the fee to Tyler Hawaii, the vendor administering the HIePRO. Payment must be made to Tyler Hawaii within thirty (30) days of receipt of invoice. The invoice is generated based on the date the award is posted.
    • OFFER DEEMED FIRM/AUTHORITY TO SUBMIT OFFER: Submission of an electronic response to the State of Hawaii constitutes and shall be deemed an offer to sell the specified goods and/or services to the State of Hawaii at the price shown in the response and under the State's Terms and Conditions.

      The electronic response submitter certifies that he/she is authorized to sign the response for the submitting vendor and that the response is made without connection with any person, firm, or corporation making a response for the same goods and/or services and is in all respects fair and without collusion or fraud.
    • QUESTIONS ABOUT THIS SOLICITATION: Unless otherwise indicated, questions regarding this solicitation must be directed to the Buyer listed.
    • VENDOR REGISTRATION IN HAWAII COMPLIANCE EXPRESS (HCE) : Vendors can register at https://vendors.ehawaii.gov/hce via an annual subscription fee and should subscribe prior to responding to a solicitation. For more information visit the HCE Section of the FAQs at http://spo.hawaii.gov/faqs/#tabs-4.
    • VENDOR COMPLIANCE – PAPER DOCUMENTS : Vendors not utilizing HCE shall provide paper certificates that must be valid at the time of award. All applications for applicable clearances are the responsibility of the vendor, who must be compliant pursuant to HRS§103D-310(c) with the chapters 1) Chapter 237, General Excise Tax Laws; 2) Chapter 382, Hawaii Employment Security Law; 3)Chapter 386, Worker’s Compensation Law; 4) Chapter 392, Temporary Disability Insurance; 5)Chapter 393, Prepaid Health Care Act; and 6) §103D-310(c), Certificate of Good Standing (COGS) for entities doing business in the State. Upon receipt of compliance paper documents (A-6, LIR#27, COGS), the purchasing agency reserves the right to verify their validity with the respective issuing agency.

    Attachment Preview

    STATE OF HAWAII
    DEPARTMENT OF DEFENSE
    HAWAII ARMY NATIONAL GUARD
    PROJECT TITLE:
    CA-202505-C BUILDING 46 MEDCOM RENOVATIONS, KALAELOA,
    OAHU, STATE OF HAWAII, DEPARTMENT OF DEFENSE, HAWAII
    ADDENDUM NO. 1
    The items listed hereinafter are hereby made a part of the contract for the above-
    mentioned project and shall govern the work taking precedence over previously issued
    contract documents governing the items mentioned. Receipt of this addendum is to be
    acknowledged on page OF-8 of the proposer's packet.
    CLARIFICATIONS:
    1. Hazmat Reports have been attached to the end of this Addendum as Attachment #1.
    2. Fire Alarm Shop Drawings have been attached to the end of this Addendum as
    Attachment #2.
    3. Specification Section 08111 - Hollow Metal Doors and Frames has been attached to the
    end of this Addendum as Attachment #3.
    4. Requests for Substitution
    SECTION/ITEM SPECIFIED SUBSTITUTE OR VARIANT RESPONSE
    BRAND ALTERNATE FEATURES
    07210, 2.01, A. ASTM C 1289, SOPRA Iso None No exceptions
    Type I or II 20 Insulation, taken to
    PSI, R-20 ASTM C 1289 proposed
    minimum Type I or II, 20 substitution,
    PSI, R-20 provided it
    minimum meets the
    specifications.
    Subject to
    further review
    and comments
    during the

    formal submittal process.
    07210, 2.01, B. Tapered EPS Foam 2.0 lb. density, ASTM C 578 Type I SOPRA Iso TAPERED Insulation, ASTM C 1289 1. PolyIso No exceptions taken to proposed substitution, provided it meets the specifications. Subject to further review and comments during the formal submittal process.
    07531, 1.04, C.1.,2. & 3. 15-Year NDL warranty with 105 MPH Wind Rider 20-Year NDL with 105 MPH Wind Rider (SOPREMA Platinum Warranty) 1. Exceeds specified warranty term No exceptions taken to proposed substitution, provided it meets the specifications. Subject to further review and comments during the formal submittal process.
    07531, 2.02, A.1. 60 MIL TPO Membrane ASTM D 6878 SOPREMA SENTINEL P- 150 60 MIL PVC Membrane, ASTM 4434, Type III 1. PVC Membrane No exceptions taken to proposed substitution, provided it meets the specifications. Subject to further review and comments during the formal

    formal
    submittal
    process.
    07210, 2.01, B. Tapered EPS SOPRA Iso 1. PolyIso No exceptions
    Foam 2.0 lb. TAPERED taken to
    density, ASTM C Insulation, proposed
    578 Type I ASTM C 1289 substitution,
    provided it
    meets the
    specifications.
    Subject to
    further review
    and comments
    during the
    formal
    submittal
    process.
    07531, 1.04, 15-Year NDL 20-Year NDL 1. Exceeds No exceptions
    C.1.,2. & 3. warranty with with 105 MPH specified taken to
    105 MPH Wind Wind Rider warranty term proposed
    Rider (SOPREMA substitution,
    Platinum provided it
    Warranty) meets the
    specifications.
    Subject to
    further review
    and comments
    during the
    formal
    submittal
    process.
    07531, 2.02, 60 MIL TPO SOPREMA 1. PVC No exceptions
    A.1. Membrane SENTINEL P- Membrane taken to
    ASTM D 6878 150 60 MIL PVC proposed
    Membrane, substitution,
    ASTM 4434, provided it
    Type III meets the
    specifications.
    Subject to
    further review
    and comments
    during the
    formal

    submittal process.
    10161, 2.01, A. (Solid Plastic Toilet Partitions and Urinal Screens) Hiny Hiders Toilet Partitions None Proposed substitution will only be approved on condition that color selection is fire-tested. Subject to further review and comments during the formal submittal process.

    submittal
    process.
    10161, 2.01, A. Hiny Hiders None Proposed
    (Solid Plastic Toilet Partitions substitution will
    Toilet Partitions only be
    and Urinal approved on
    Screens) condition that
    color selection
    is fire-tested.
    Subject to
    further review
    and comments
    during the
    formal
    submittal
    process.
    5. Questions and Answers have been answered on HIePro and are listed below.
    1. There are no bid documents posted (plans & specs.) or link to download. How do we
    get these?
    I apologize. Plans and Specs will be uploaded to HIePRO on Monday, August 3. In the
    meantime, they can be viewed here: https://dod.hawaii.gov/hieng/plans-and-
    specs/building-46-medcom-renovations-kalaeloa-oahu-hiarng/
    2. The drawings indicate hollow metal doors and frames; however, no corresponding
    specification section was found in Division 08. Please provide the applicable
    specifications for the hollow metal doors and frames, including material, gauge,
    finish, and fire-rating requirements.
    Response: Specification Section 08111 - Hollow Metal Doors and Frames has been added.
    3. Is there a Buy America(n) requirement for this project? If so, are fixtures complying
    with TAA (Trade Agreement) acceptable?
    Response: There is no Buy America Act requirement for this project.
    4. Is Pollution Insurance coverage required for this project per Item 3D of Attachment
    S5?
    Response: Pollution insurance will be required only if Bid Alt #7 Roof Replacement is
    awarded.

    5. During our review of the contract documents, the scope of work for the solid surface
    material was identified; however, no specific information was found regarding the
    manufacturer, product type, color, or grade. Please provide the requested information.
    Response: Manufacturer: Corian Solid Surface, Color: Silver Birch, or approved equal. For
    more information, please refer to SECTION 06220 - SOLID SURFACE COUNTERTOPS
    6. Please provide the company name of the Fire Alarm vendor / contact for this
    building
    Response: Refer to attached fire alarm shop drawings for the recently installed system.
    7. Specification Section 01715 references an Asbestos/Lead/Hazardous Material
    Survey, but the report for the existing roof is missing. Please provide the hazardous
    material survey for the existing roof.
    Response: Refer to prior hazardous material surveys included with this addendum.
    8. Locations and quantities of concrete deficiencies are not shown on the drawings.
    Please provide the scope quantities for the spall and crack repair details referenced in
    section 03930 and structural drawings. Additionally, please confirm whether this work
    is included in the base bid or under the alternates.
    Response: Grid F7 on Plan S-102 Base Bid
    9. Per specification section 01715, the state's hazardous material survey indicates that
    asbestos was not detected for this project. Please confirm if this understanding is
    correct.
    Response: Previous testing performed by the state has determined that the roof contains
    asbestos. Work related to asbestos is included in Section 13280. Refer to prior hazardous
    material surveys included with this addendum.
    10. Door details indicate a bevel at door openings, but existing CMU and concrete
    walls are not currently beveled. Please clarify if beveling is required for new, existing,
    or all wall openings.
    Response: Beveling is not required. Door opening edge profiles/details to match existing
    conditions.
    11. Per sheet A-601, all new hollow metal door frames show a standard 2" face width;
    however, the existing door frames have a 4" header face. Please confirm if 2" frame

    faces are required or if 4" header faces should be provided to match existing
    conditions.
    Response: Provide 4" header faces to match existing conditions.
    12. The room finish schedule indicates existing ceilings are to remain, except where
    replacement is specified. Please clarify if new ductwork, cable trays, piping, and
    related utilities are to be exposed and surface-mounted below the existing drywall
    ceilings where ceilings are retained.
    Response: All work will be concealed above ceilings. Ceilings shall be replaced wherever
    necessary to install new MEP work, and all associated costs for repair and finishing shall be
    included under the base bid. Extent of ceiling replacement is expected to be coordinated
    between subcontractors and all costs included.
    13. Can a contractor holding only a C-13 license be the general contractor on this job?
    Response: No. An A or B license is required to be the prime bidder.
    14. What is the difference between base bid electrical and the additive alternatives
    listed for electrical?
    Response: Refer to description of base bid items shown on E-001, and additive alternates
    listed on following sheets. In general the base bid is to include all electrical panels,
    metering switchboard, and feeders, as well as any branch circuiting associated with the
    new layouts (also called out as "Base Bid" on drawings).
    15. Should base bid include finishes for ceiling, painting, and flooring?
    Response: Refer to response to Question #19.
    16. The painting and flooring on the first and second floors of Building 46 look fairly
    new. What is the scope for painting and flooring?
    Response: Refer to response to Question #19.
    17. Where is the elevator?
    Response: Elevator is identified throughout drawings. Refer to floor plans with room tag
    "ELEV".
    18. Is the HVAC system to be a Toshiba brand?
    Response: Basis of design manufacturer has been provided on mechanical schedules, but
    the contractor is not restricted from using other brands of matching performance

    characteristics.
    19. What is the difference between the base bid and the three additive alternatives for
    architecture on the three floors?
    Response:
    Base Bid:
    First Floor Rooms:
    - 106 Lactation Room, 108 Storage, 110 Electrical 1A, 112 Telecom, 114 Mechanical
    - 015 Corr 1D
    - 115 Women's RR, 116 Janitor, 117 Men's RR
    - 107 Pad Check-Out, 109 Pad Office, 111 Med Records, 113 Storage, 016 Corridor 1E
    - Wall demolition/refinishing for existing wall demising existing Offices 105/107 and Offices
    106/108
    -Opening/repair of chase walls to install any MEP utilities
    -Construction of associated walls/finishes in the specific vicinity of the plumbing fixtures at
    118 EKG, 119 IMMZ/CHOL A, 121 IMMZ/CHOL B, Dental 122, 123, 124, 125, 127 Hearing
    Room
    Second Floor Rooms:
    -214 Jan
    -215 Women's RR
    -218 Men's RR
    -024 Corridor 2D
    Third Floor Rooms:
    -314 Men's RR
    -315 Jan
    -319 Women's RR
    -320 Men's Shower, 321 Women's Shower
    Additive Alternate:
    1st floor , 2nd floor and 3rd floor architectural demo and new work, all work not included in
    base bid.
    20. Is the existing HVAC system and concrete pad below to remain, since they are
    fairly new?
    Response: Refer to mechanical drawings for scope associated with the existing equipment
    and pads.
    21. How are ceilings to remain if ductwork is running through it? Do the ceilings need
    to be replaced?

    Response: Refer to response to Question #12 above.
    22. Is the roof substrate a concrete slab?
    Response: Yes, roof substrate is concrete slab.
    23. How many new water heaters are to be installed?
    Response: Refer to equipment schedules on plumbing drawings.
    24. Since existing CMU walls are to remain, can controllers and other devices be
    surface-mounted?
    Response: Yes, where devices are shown on existing CMU walls, the devices and conduits
    will be surface mounted. Where devices are installed on new walls, the devices and
    conduits shall be recessed.
    25. Will the project be awarded based on the total of Base Bid and all Additive
    Alternates or is it possible that some Additive Alternates may be included but not
    others?
    Response: Project will be awarded according to the best interests of the State.

    CA-202505-C Addendum
    Attachment #1
    BLDG 46 HAZMAT Report
    Inventory Pages 1-18
    Summary Pages 19-27

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL
    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.