ODNR, Division Of Oil & Gas, Cambridge Lab- Corrective & Preventative Maintenance For Perkin Elmer U.S. LLC

Location: Ohio
Posted: Jan 13, 2025
Due: Mar 12, 2025
Agency: State Government of Ohio
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: SRC0000027352
Publication URL: To access bid details, please log in.
Solicitation ID: SRC0000027352
Solicitation Name: ODNR, Division Of Oil & Gas, Cambridge Lab- Corrective & Preventative Maintenance For Perkin Elmer U.S. LLC
Original Begin Date: 1/13/2025 3:53:11 PM
Begin Date: 1/13/2025 3:53:11 PM
End Date: 3/12/2025 2:00:00 PM
Inquiry End Date: 3/5/2025 12:00:00 AM
Commodity: Laboratory equipment maintenance
MBE Set Aside: MBE Set Aside
Agency: DNR900200 OIL AND GAS DNRFRA
Solicitation Status: Open for Bidding
Solicitation Type: Quick Quote

Solicitation General Information
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
Solicitation ID
SRC0000027352
Solicitation Name
ODNR, Division Of Oil & Gas, Cambridge Lab- Corrective & Preventative Maintenance For Perkin Elmer U.S. LLC
RFx Type
Quick Quote
Lot #
1
Solicitation Status
Open for Bidding
Round #
1
MBE Set Aside
Begin Date
1/13/2025 3:53:11 PM (EST)
Amendment?
End Date
3/12/2025 2:00:00 PM (EST)
Inquiry End Date
3/5/2025 12:00:00 AM
Summary
**WINNING BIDDER MUST BE AUTHORIZED BY PERKIN ELMER TO MAINTAIN EQUIPMENT & COMPLETE REPAIRS**

Cambridge Labs – Perkin Elmer Equipment Maintenance Plan

  1. Purpose:
    1. The Cambridge Lab analyzes samples provided by the Division of Oil & Gas Resources Management & The Division of Mineral Resources Management. This contract will provide maintenance for FY2025 on the Avio 220 ICP and Gas Chromatograph.
  1. Reasoning:
    1. The maintenance contract is needed to repair and maintain the existing Perkin Elmer equipment and associated components at the Cambridge Laboratory used to perform analysis for mining and oil & gas operations. Analysis performed by the Cambridge Laboratory ensures the protection of natural resources and citizens within the State of Ohio. If the maintenance contract is not in place for these systems at the laboratory facility, the cost to repair the needed equipment includes time of travel, labor, and parts at a cost much higher than what is included in the maintenance contract. This maintenance contract is needed to keep the equipment in proper working order for the needed analysis. The maintenance contract also eliminates unneeded downtime for analysis due to priority listing with such maintenance contracts. If maintenance is performed by another vendor other than the manufacturer of the equipment, warranties can be voided and the maintenance may not be properly performed, leading to equipment failures and improper analysis.
    2. The Cambridge Laboratory has always maintained equipment with the use of maintenance contracts. The vendor who maintains the equipment has service engineers who are properly trained in the repair and maintenance of the equipment. Once a year, the service engineer performs a preventative maintenance visit to keep the equipment in proper working order. This preventative maintenance visit is included in our maintenance contract. The cost of the maintenance contract is more cost effective than performing the maintenance as needed. Laboratory personnel are not trained in the detailed maintenance of the equipment. Vendor must be authorized by Perkin Elmer to perform all work on Perkin Elmer lab equipment.
  1. Requirements:
    1. Vendor must be approved by Perkin Elmer to complete services on equipment
    2. Vendor must bid on all items listed
    3. Formal quote and copies of Terms & Conditions should be submitted with bid.
    4. All specific Standard Terms & Conditions and Service Terms and Conditions will be reviewed by ODNR Legal Staff. Changes or redlines must be mutually agreed to in writing.


  1. Location & Billing:
    1. Location:
      1. Services will be performed at Ohio Department of Natural Resources Environmental Lab located at:
325 North 7 th Street
Cambridge, OH 43725
740-439-5591
    1. Billing:
All invoices must be submitted DIRECTLY to Financial Shared Services (FSS).
There are two options available to submit invoices to OSS: OBM Shared Services
Attn: Accounts Payable
PO Box 182880
Columbus, Ohio 43218-2880

To ensure the payment process is not delayed, invoices should be complete, accurate, and contain the following information:
All fields mentioned above are required to count as a correct invoice; failure to provide this information will result in a returned invoice and delayed payment.

  1. Perkin Elmer Avio 220 Inductively Coupled Spectrometry Specifications & Maintenance Requirements:
    1. Specifications:
      1. Maintenance Contract will run from July 1 st 2025 through June 30 th 2026.
      2. Contractor must be authorized by Perkin Elmer to complete maintenance and repairs on Perkin Elmer Equipment.
      3. Service Plan should follow levels that are referenced below and must include 1 PM.
    1. Asset List With Serial Numbers:


  1. Perkin Elmer Gas Chromatograph Specifications & Maintenance Requirements:
    1. Specifications:
      1. Maintenance Contract will run from July 1 st 2025 through June 30 th 2026.
      2. Contractor must be authorized by Perkin Elmer to complete maintenance and repairs on Perkin Elmer Equipment.
      3. Service Plan should follow levels that are referenced below and must include 1 PM.

    1. Asset List With Serial Numbers:
Process

Awarded to the lowest responsive and responsible authorized to complete work on Perkin Elmer equipment installed at the ODNR - Cambridge labs.

Ship To
Contracting Entity
DNR900200 OIL AND GAS DNRFRA
1 Record(s)
0 Record(s)
Solicitation Documents
Keywords
Search Reset
Title Type Att. Validity End Date Validity End Date
Specifications & Asset Information Public Solicitation Documents (Approved)
1 Record(s)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...for the proper handling, maintenance, storage and protection of all materials and equipment ...

DEPT OF DEFENSE

Bid Due: 6/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.