SAN-CR 213-0.67 Bridge Replacement

Location: Ohio
Posted: Dec 8, 2025
Due: Dec 11, 2025
Agency: Sandusky County Engineer's Office
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Project Name Opening Date Documents
SAN-CR 213-0.67 Bridge Replacement Bid Opening at 10:30 am December 11, 2025 at Sandusky County Board of Commissioners Soil Boring Report
Plan Holder's List
Unit Price Contract (Excel Spreadsheet)
Contract Documents
Contract Plans
Legal Ad

Attachment Preview

STRUCTURE FOUNDATION EXPLORATION
PROPOSED BRIDGE REPLACEMENT
COUNTY ROAD 213 OVER GREEN CREEK
GREEN CREEK TOWNSHIP, SANDUSKY COUNTY, OHIO
SUBMITTED TO:
SANDUSKY COUNTY ENGINEER
Attention: Carlos A Baez Sr., P.E., P.S.
2500 West State Street
Fremont, Ohio 43420
BMI Report No. 20002573-0625-394
June 16, 2025
©
1419 Miami Street
Toledo, OH 43605
p. 419.691.4800
f. 419.691.4805
TOLEDO ENGINEERING SERVICES
1419 Miami Street
Toledo, Ohio 43605
P. 419.691.4800 F. 419.691.4805
www.bowser-morner.com
June 16, 2025
Sandusky County Engineer
Attention: Carlos A. Baez Sr., P.E., P.S.
2500 West State Street
Fremont, Ohio 43420
Dear Mr. Baez:
Re: Structure Foundation Exploration
Proposed Bridge Replacement
County Road 213 over Green Creek
Green Creek Township, Sandusky County, Ohio
Report No. 20002573-0625-394
Report Consists of 31 Pages
Bowser-Morner, Inc. (BMI) has completed the authorized subsurface exploration and laboratory testing
for the above- referenced project.
The purpose of this exploration was to evaluate the subsurface conditions beneath the proposed bridge
replacement along County Road 213 over Green Creek. The attached report briefly reviews our
exploration procedures, describes existing site and subsurface conditions, and presents our laboratory
results.
For your convenience, soil samples are normally retained in our laboratory for a period of 60 days before
they are discarded. To view the samples or arrange for longer storage of samples, please contact us.
We have enjoyed working with you on this project and are prepared to assist you at any time. Please
contact us if you have questions about this report or if we may be of further service.
Respectfully submitted,
BOWSER-MORNER, INC.
Ahmad K. Rashid, P.E.
Chief Geotechnical Engineer
Manager, Toledo Engineering and
Environmental Services
AKR:kko
Distribution: Client (via email: CBaez@sanduskycountyoh.gov)
DGL Consulting Engineers, LLC, Attn.: Jeffrey Yoder, PE, CPESC (via email: JYoder@dgl-ltd.com)
Civil & Geotechnical
Engineering
Environmental
Consulting
Construction QA/QC and
Special Inspections
Analytical, Construction Materials
and Geotechnical Laboratories
DAYTON, OH • TOLEDO, OH • SPRINGFIELD, IL
GUIDELINES FOR THE USE OF THIS REPORT
& MANDATORY INFORMATION
This BMI geotechnical report has been prepared for the exclusive use of the Sandusky County
Engineer for use in connection with the planned proposed bridge replacement along County
Road 213 over Green Creek in Green Creek Township, Sandusky County, Ohio. The data and
findings contained within this report are intended to:
Aid the client in evaluating the feasibility of developing this site for the intended project,
Provide the design engineer information that will make specific recommendations
concerning foundation support for the new bridge abutments.
This report is not a construction document. Although there is information within this report
that may assist experienced contractors and engineers in identifying risks and construction
issues that may develop over the course of this project, our scope of services did not include a
detailed review of potential constructability concerns.
Because this report was very likely prepared before structure orientations, grades, loads and
other features have been finalized, it is strongly recommended that BMI be retained to review
final design documents prior to the start of construction when potential weather impacts and
design requirements can be fully understood and addressed.
All reports remain the confidential property of BMI no publication or distribution of any portion
of this report may be made without our express written consent, except as authorized by
contract. Results contained in this report are reflective only of the items calibrated or tested.
Unless otherwise agreed, samples or specimens will be discarded or returned at BMI's discretion.
AASHTO/ISO 17025 accreditation applies only to the parameters included in BMI's current scope
of accreditation.
BMI Report No. 20002573-0625-394
-i-
TABLE OF CONTENTS
ITEM
PAGE NO.
GUIDELINES FOR THE USE OF THIS REPORT & MANDATORY INFORMATION............................ i
TABLE OF CONTENTS ............................................................................................................ ii
1.0 EXECUTIVE SUMMARY ................................................................................................. 1
1.1 Soil Profile ................................................................................................... 1
1.2 Groundwater Observations .......................................................................... 1
1.3 Foundations................................................................................................. 1
2.0 INTRODUCTION ........................................................................................................... 2
3.0 GEOLOGY AND OBSERVATIONS OF THE PROJECT .......................................................... 2
3.1 General Geology and Hydrology ................................................................... 2
3.2 Field and Office Reconnaissance................................................................... 2
4.0 EXPLORATION.............................................................................................................. 3
4.1 Field Exploration .......................................................................................... 3
4.2 Laboratory Testing ....................................................................................... 4
5.0 FINDINGS..................................................................................................................... 4
5.1 Soil Profile ................................................................................................... 4
5.2 Groundwater Observations .......................................................................... 5
6.0 ANALYSES AND RECOMMENDATIONS........................................................................... 5
6.1 Foundations................................................................................................. 6
6.2 Groundwater Control ................................................................................... 6
6.3 Slopes and Temporary Excavation ................................................................ 7
7.0 QUALIFICATIONS.......................................................................................................... 7
TABLE OF CONTENTS
BMI Report No. 20002573-0625-394
-ii-
TABLE OF CONTENTS (continued)
ITEM
Appendix A
Appendix B
Appendix C
Boring Location Plan
Boring Logs
Laboratory Test Data
PAGE NO.
A-1
B-1 to B-2
C-1 to C-4
TABLE OF CONTENTS
BMI Report No. 20002573-0625-394
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.