| Location: | Utah |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WA2026005 |
| Publication URL: | To access bid details, please log in. |
Project Description: American Fork City Public Works, Engineering Division, "City" is soliciting proposals from qualified firm(s) "Proposer" to provide engineering, design, bidding, and construction management to replace the existing 8" waterline in Main Street (State Route 89) between Grant Ave and 200 West, known as the Main Street from Grant Ave to 200 W Waterline Replacement Project.
DESCRIPTION OF WORK: The project consists of installing approximately 3,000 linear feet of 8-inch C900 PVC waterline along the north side of Main Street from Grant Avenue to 200 West. The project also includes extending the waterline approximately 100 feet north and 160 feet south at 100 East and tying into the existing water distribution system. The scope of work includes all engineering, surveying, utility coordination, permitting, traffic control planning, public involvement, design, bidding support, and construction administration services necessary to develop and deliver a complete, fully operational municipal water system improvement project.

With GovernmentContracts, you can:
...description opening date closing date CC26-475 Main Water Tank Drainline Upgrade Project October ...
City of Riverton
Bid Due: 11/17/2026
...and install a new main water service line. The line will run from ...
State Government of Utah
Bid Due: 11/16/2026
...water service to new main line, installing 56 new water services, installing 33 ...
State Government of Utah
Bid Due: 11/19/2026
...(abandoned in place) with 4" HDPE water main and associated valves and connections ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026