| Location: | Utah |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WA2026005 |
| Publication URL: | To access bid details, please log in. |
Project Description: American Fork City Public Works, Engineering Division, "City" is soliciting proposals from qualified firm(s) "Proposer" to provide engineering, design, bidding, and construction management to replace the existing 8" waterline in Main Street (State Route 89) between Grant Ave and 200 West, known as the Main Street from Grant Ave to 200 W Waterline Replacement Project.
DESCRIPTION OF WORK: The project consists of installing approximately 3,000 linear feet of 8-inch C900 PVC waterline along the north side of Main Street from Grant Avenue to 200 West. The project also includes extending the waterline approximately 100 feet north and 160 feet south at 100 East and tying into the existing water distribution system. The scope of work includes all engineering, surveying, utility coordination, permitting, traffic control planning, public involvement, design, bidding support, and construction administration services necessary to develop and deliver a complete, fully operational municipal water system improvement project.

With GovernmentContracts, you can:
...description due date Windsor Park Improvements September 30, 2026 West Haven City WINDSOR ...
West Haven city
Bid Due: 9/30/2026
...Conservation Service (NRCS), the Kane County Water Conservancy District (KCWCD) and the Washington... ...
Washington County Water Conservancy District
Bid Due: 11/02/2026
...consists of two facilities: Adult Detention Center (ADC) - Metro Jail 3415 South ...
State Government of Utah
Bid Due: 10/13/2026
...to 700 West. The Work generally includes, but is not limited to, the ...
State Government of Utah
Bid Due: 9/30/2026