| Location: | Connecticut |
|---|---|
| Posted: | Aug 11, 2026 |
| Due: | Sep 8, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 38447 |
| Publication URL: | To access bid details, please log in. |
Town of Suffield - New Sidewalk along Mapleton Avenue
The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Bill Hawkins 83 Mountain Road Suffield CT, 06078 United States Tel: 860-668-3848 Fax: bhawkins@suffieldct.gov

With GovernmentContracts, you can:
Window Replacement Services Addendum #1 Addendum #2
Town of Plainfield
Bid Due: 11/10/2026
TMP2026-2 Embankment Wall Replacement - Lowe Street This solicitation is being posted to
State Government of Connecticut
Bid Due: 11/17/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Bid Due: 11/12/2026
Description Opening Date/Time Closing Date/Time IFB #2026-116 Monitoring, Inspection, Testing, Maintenance and Repair
Hartford Housing Authority
Bid Due: 11/12/2026