| Location: | Connecticut |
|---|---|
| Posted: | Aug 11, 2026 |
| Due: | Sep 8, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 38447 |
| Publication URL: | To access bid details, please log in. |
Town of Suffield - New Sidewalk along Mapleton Avenue
The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Bill Hawkins 83 Mountain Road Suffield CT, 06078 United States Tel: 860-668-3848 Fax: bhawkins@suffieldct.gov

With GovernmentContracts, you can:
...similar repair/lining work for additional needs, such as storm pipe repair and/or lining, ...
City of Meriden
Bid Due: 10/01/2026
...consultants to develop and standardize the Town's municipal separate storm sewer system data ...
State Government of Connecticut
Bid Due: 10/20/2026
...consultants to develop and standardize the Town's municipal separate storm sewer system data ...
Town of Plainfield
Bid Due: 10/20/2026
...is a critical life-safety public infrastructure asset providing immediate flood and storm protection... ...
DEPT OF DEFENSE
Bid Due: 9/23/2026