| Location: | Connecticut |
|---|---|
| Posted: | Aug 11, 2026 |
| Due: | Sep 8, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 38447 |
| Publication URL: | To access bid details, please log in. |
Town of Suffield - New Sidewalk along Mapleton Avenue
The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Bill Hawkins 83 Mountain Road Suffield CT, 06078 United States Tel: 860-668-3848 Fax: bhawkins@suffieldct.gov

With GovernmentContracts, you can:
...on the upstream slope. Construction of a 100-foot long auxiliary spillway with concrete ...
State Government of Connecticut
Bid Due: 10/06/2026
...1 work consists of: Installation and maintenance of construction entrance and erosion and ...
State Government of Connecticut
Bid Due: 10/02/2026
...purpose of this project is to construct concrete sidewalks, curbs, and ramps on ...
City of Meriden
Bid Due: 10/02/2026
...City Sidewalks The purpose of this project is to construct concrete sidewalks, curbs, ...
State Government of Connecticut
Bid Due: 10/02/2026