| Location: | Federal |
|---|---|
| Posted: | Aug 3, 2025 |
| Due: | Sep 5, 2025 |
| Agency: | Metropolitan Washington Council of Governments. |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFP 25-014 |
| Publication URL: | To access bid details, please log in. |
Project Description: COGTools is an ArcGIS add-in, written in VB.NET, used for developing and maintaining transportation networks used in the COG/TPB Regional Travel Demand Forecasting Model. COGTools needs to be migrated from ArcGIS 10.8 to ArcGIS Pro. COGTools also needs to be migrated from VB.NET to a new programming language, such as C#. There are two alternatives for the migration:
• Alternative 1 – Direct Migration (ArcGIS 10.8 + VB.NET would be migrated directly to ArcGIS Pro + C#)
• Alternative 2 – Phased Migration (i.e., first, ArcGIS 10.8 + VB.NET would be migrated to ArcGIS Pro + VB.NET, and, then the vendor would conduct a subsequent migration to ArcGIS Pro + C#)
In their proposals, the contractor will propose cost estimates and timelines on both alternatives, explain their preferred approach with justification, and propose detailed steps to complete each of the four tasks that are detailed in this RFP.
Based on the contractor proposals, COG/TPB staff will decide which approach to take (Alternative 1 or Alternative 2).
Once the contract is awarded, the contractor will perform the two-part software migration (i.e., platform migration and programming language migration) using the selected alternative approach.

With GovernmentContracts, you can:
...and drivers. Strong writing skills, including the use of editing tools. Proficient in ...
TREASURY, DEPARTMENT OF THE
Bid Due: 6/30/2026