| Location: | Utah |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 525003129 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work under this Rehabilitation Project will take place within a portion of the City’s 1200 W sewer trunk line located along 1300 S, from State Street to 700 West.
The Work generally includes, but is not limited to, the following:
• Water-cured CIPP Rehabilitation of approximately 6,386 LF of 48-inch, 54-inch, and 60-inch diameter RCP trunk line.
• Furnishing, installation and uninterrupted maintenance/oversight of a flow control bypass pumping system of the trunk line, including odor control, tributary and sewer service lateral connections.
• Groundwater management as required for CIPP and manhole rehabilitation, including any treatment, handling and disposal in accordance with applicable permits and regulations.
• Permitting with Salt Lake City Right of Way and Traffic Control, UDOT, UPRR, and UTA.
• Rehabilitation of 16 manholes with an epoxy coating system.
• Cleaning, video inspection of the existing trunk line, location of existing active laterals and completion of all necessary spot repairs for CIPP rehabilitation.
• Reconnection of all active laterals and disconnection of inactive laterals to the rehabilitated trunk line.
• Completion of post construction testing and video inspection of the rehabilitated trunk line and manholes.
• Coordinating with other agencies and performing public relations and outreach activities during construction.

With GovernmentContracts, you can:
...with an epoxy coating system. * Cleaning, video inspection of the existing trunk ...
State Government of Utah
Bid Due: 9/30/2026
...Reinforcing Steel, Epoxy Coated: 138,000 LB 55601-1100 Bridge Railing, Steel, Two Rail: 642 ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/23/2026