| Location: | Texas |
|---|---|
| Posted: | Aug 3, 2025 |
| Due: | Sep 11, 2025 |
| Agency: | City of Burleson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFCSP 2025-003 Industrial Blvd PS Expansion; Alsbury Blvd PS Decommissioning |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the construction of a new pump station with a 14.4 MGD initial firm capacity (16.5 MGD ultimate). The project includes, but is not limited to: ~4,800 SF Pump Station Building, three (3) 5,000 gpm horizontal split case pumps and 400 HP motors, one (1) 2 Million Gallon prestressed concrete ground storage tank, one (1) City of Fort Worth wholesale meter station, yard piping and other site improvements, ~1,200 LF offsite 24-inch water line, electrical system including a 1,500 kW emergency generator and controls, demolition of existing Alsbury Pump Station, and demolition of existing Industrial Park Blvd Pump Station.

With GovernmentContracts, you can:
...36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing ...
City of Austin
Bid Due: 7/09/2026
...for activities such as zero-gravity or 1/6th gravity simulations, on-water search and rescue ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 9/30/2026
..., Planting, etc. Not Grounds Maintenance or Tree Trimming Services * 91360 - ...
City of San Antonio
Bid Due: 6/23/2026