| Location: | Texas |
|---|---|
| Posted: | Aug 3, 2025 |
| Due: | Sep 11, 2025 |
| Agency: | City of Burleson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFCSP 2025-003 Industrial Blvd PS Expansion; Alsbury Blvd PS Decommissioning |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the construction of a new pump station with a 14.4 MGD initial firm capacity (16.5 MGD ultimate). The project includes, but is not limited to: ~4,800 SF Pump Station Building, three (3) 5,000 gpm horizontal split case pumps and 400 HP motors, one (1) 2 Million Gallon prestressed concrete ground storage tank, one (1) City of Fort Worth wholesale meter station, yard piping and other site improvements, ~1,200 LF offsite 24-inch water line, electrical system including a 1,500 kW emergency generator and controls, demolition of existing Alsbury Pump Station, and demolition of existing Industrial Park Blvd Pump Station.

With GovernmentContracts, you can:
...domestic water well, water transmission main, cooling tower, and ground storage tank facility... ...
State Government of Texas
Bid Due: 10/01/2026
...Old McGregor Ground Storage Tank Improvements Follow Solicitation Solicitation ID: RFB2026-045..., Water System/Plants, ...
State Government of Texas
Bid Due: 10/29/2026
...rehabilitation of the 1,000,000-gallon ground water tank and 150,000-gallon elevated water tower... Follow ...
JUSTICE, DEPARTMENT OF
Bid Due: 10/13/2026
...Bid Number: 938043.00 Bid Title: Potable Water Storage Tank Rehabilitation Category: Request... will ...
City of Jacksonville
Bid Due: 10/01/2026