| Location: | Connecticut |
|---|---|
| Posted: | Jun 24, 2026 |
| Due: | Jul 15, 2026 |
| Agency: | City of Meriden |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: B027-08 Edison Middle School Floor Replacement
Addenda: 0
Release Date: 6/24/2026
Due Date: 7/15/2026
The City of Meriden is seeking the services of a contractor to remove and replace approximately 4,088 sq ft of VCT flooring in SOAR hallway, gym, teacher offices, and connected side halls (as highlighted on attached drawings) at Edison Middle School.
The flooring contractor shall, rip out, remove, and properly dispose of the existing flooring prior to prepping and installing the new flooring.
The flooring contractor shall also be responsible for providing dumpsters for the disposal of the flooring material and maintain them through the duration of the project.
The contractor is to install Mapie Planiseal, Sika MB, Ardex MC Rapid 20-year warranted epoxy moisture mitigation system or equivalent before installing new VCT to match existing patterns.
Floor grinding will be performed with a HEPA vacuum attached, but it is not 100% dust free. Precautions should be made by others to move, cover, and/or protect delicate surrounding surfaces.
Furniture moving and VCT waxing to be done by others.
Work could be completed during the summer hours of 6:00 am to 2:30 pm daily.

With GovernmentContracts, you can:
..., "Downtown Danbury Streetscape Renaissance Project: Phase 2b (Main St. (North - East), ...
City of Danbury
Bid Due: 7/21/2026