| Location: | Georgia |
|---|---|
| Posted: | Feb 17, 2026 |
| Due: | Mar 18, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-77075-NONST-2026-000000016 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-77075-NONST-2026-000000016 | 226-0318-02_Wynn Lake-Antioch-Lake Forest-Hancock | Banks County Board Of Commissioners |
Feb 17, 2026 @ 12:33 PM
|
Mar 18, 2026 @ 09:00 AM
|
Start Date: Feb 17, 2026 @ 12:33 PM ET
End Date:
Mar 18, 2026 @ 09:00 AM ET
Approximately 5.48 miles of patching, recycled asphaltic concrete resurfacing, striping, and shoulder filling on WYNN LAKE RD (HUDSON RIVER BRIDGE TO OLD 441 HIGHWAY), ANTIOCH RD, LAKE FOREST DR, and HANCOCK WAY.
| Code | Description |
| 74501 | Aggregate, Precoated |
| 74502 | Asphalt, AC (Asphalt Cement) |
| 74507 | Asphalt, Cutback (With Latex Polymer) |
| 74506 | Asphalt, Cutback |
| 74505 | Asphalt, Aggregates |
| 74504 | Asphalt, AC (With Latex Polymer) |
| 74508 | Asphalt, Emulsified |
| 74510 | Asphalt, Emulsified (With Latex Polymer) |
| 74511 | Asphalt, Pervious Hot Mix |
| 74512 | Asphalt, Oil |
| 74513 | Asphalt, Uintaite |
| 74514 | Asphaltic Concrete, Cold Laid, Rock Asphalt |
| 74521 | Asphaltic Concrete, Hot Laid Including Bituminous Materials |
| 74528 | Asphaltic Shell |
| 74565 | Patching Mix, Asphalt Concrete |
| 74567 | Patching Mix, Cutback Asphalt |
| 74568 | Recycled Asphalt and Asphalt Products |
Julie wofford
jwofford@co.banks.ga.us
706-677-6902

With GovernmentContracts, you can:
...INVITATION FOR BID LMIG 2026 FOR MILLING, PATCHING AND RESURFACING Suwanee, City Of ...
State Government of Georgia
Bid Due: 7/06/2026
...Superpave patching at 330 / SY, +- 1584 tons of spot leveling with ...
State Government of Georgia
Bid Due: 6/16/2026
..., patching of asphalt pavement (as required), new asphalt pavement, crack sealing (as ...
State Government of Georgia
Bid Due: 6/30/2026
...: Link Description The construction of +-4.88 miles of patching, leveling, and resurfacing, ...
State Government of Georgia
Bid Due: 7/07/2026