| Sourcing Project Number: | SRC0000034370 |
| Solicitation Label: | CAP26*360060 Basement Dehydration Installation |
| Status: | Open for Bidding |
| Due / Close Date: | 6/30/2026 |
| Main Commodity: | BUILDING MAINTENANCE, INSTALLATION AND REPAIR SERVICES |
| Solicitation Type: | Quick Quote |
| Buying Agency: | Capitol Operations and First White House |
| Sourcing Responsible First Name: | Jennifer |
| Sourcing Responsible Last Name: | Hodges |
|
Code
SRC0000034370
|
|
|
Solicitation Name
CAP26*360060 Basement Dehydration Installation
|
Solicitation Type
Quick Quote
|
|
Round #
Rounds are used to issue amendments and could be used to continue a solicitation with a “short-listed” set of suppliers.
1
|
Status
Open for Bidding
|
|
Begin
6/24/2026 2:53:29 PM (CST)
|
Award Status
|
|
End
6/30/2026 5:00:00 PM (CST)
|
|
|
Summary
Basement Dehydration Installation
Provide a building survey to verify location of dehydration units (antenna).
Furnish and install the Dehydration system in areas with high conductivity reading (by Hydrometer) over 100 on internal masonry walls and concrete slabs. Antennas to be installed through the affected areas as required to maximize the frequencies required to pull the damp away.
Provide a follow-up moisture measurement assessment until building areas are dry.
A Preconstruction Conference will be required prior to start of Work.
AREA OF WORK:
Basement areas and lower that have a Hydrometer reading of 100 or greater.
Contracted company to provide and install as required. The equipment does not require electricity.
COORDINATION:
The majority of the Work can take place during normal business hours. Normal Business hours are 7:00 am-5:00 pm. The Company to coordinate with Owner/Tenants. Weekends and State Holidays have no time constraint as coordinated with Facility Manager and tenant.
The State shall issue one (1) card key to the Company’s Project Manager. The Company’s Project Manager will be held responsible for his/her employees’ access and behavior. Any employee wandering around the building and/or displaying any improper behavior will be removed from the building and not be allowed to return.
TIMELINE: Five (5) Calendar days.
Warranty:
Company to Provide a 3-year dry-out guarantee
Company to provide a 25-year functional warranty on the building dehydration system. Company to add or replace units if deemed necessary at no cost to the Owner
|
|
|
Additional Information
|
|
Selected
|
| Documentation | Type | Att. | Validity End Date | Version |
| specs | Public Solicitation Documents (Approved) | |||
| Quick Quote Standard Boilerplate | RFx Commercial Document (Approved) |

With GovernmentContracts, you can:
...:00 PM (CST) Rfp public bid open date (CST) Aug 5 2026 10:00AM ...
State Government of Alabama
Bid Due: 8/04/2026
...for Information (RFI) Industry Survey. Response deadline extended to COB 5 April 2024. ...
Federal Agency
Bid Due: 12/31/2027
...attached updated MAPSS Request for Information (RFI) Industry Survey. Response deadline extended... Survey. ...
DEPT OF DEFENSE
Bid Due: 12/31/2027
...March 2024. 2) Please see attached updated MAPSS Request for Information (RFI) Industry ...
DEPT OF DEFENSE
Bid Due: 12/31/2026