| Location: | Federal |
|---|---|
| Posted: | Sep 22, 2025 |
| Due: | Oct 10, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8128-26-X-XXXX-EAC |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Government is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet the requirements for the remanufacture effort for the EAC, part number 2117580-2-1 and NSN 1420-01-098-5936. The Flight Control Servo Assembly (FCSA) consists of two identical linear actuators, driven by a common electronic control unit, the Elevon Actuator Controller (EAC). The controller consists of circuits to perform actuator position signal summing, error signal amplification, servo loop compensation, and power drive stages for the servo motors, current limiting, and buffer circuits to output position, motor current monitor signals and motor voltage monitor signals. The EAC accepts analog voltage inputs proportional to the elevon position command, 28 VDC power, and +- 15 VDC power. The 28 vdc and +- 15 dc grounds are isolated outside of the servo assembly. The FCSA controls the elevon which guides the missile to its intended target. The purpose of this remanufacture effort is to provide a full rate production effort of the remanufactured EACs that meets the original design requirements and all nuclear hardness requirements.
The contractor shall be capable of producing 550 remanufactured EACs with the work to include disassembly, cleaning, inspection, assembly, testing, troubleshooting, and root-cause failure analysis to return an unserviceable EAC to a serviceable or like-new condition.
The contractor shall be capable of furnishing all labor, materials, facilities, and equipment required to accomplish the remanufacture and all required testing to include functional testing and product reliability verification testing (PRVT). Specifically, the contractor shall be capable of producing EAC-specific test equipment to confirm each produced EAC’s conformance to the requirements of envelope drawing 232-11704. Additionally, the contractor may be responsible for supply chain management, logistics planning, long-lead time parts procurement, diminishing manufacturing sources, and material shortage issues.
Throughout this effort, the contractor shall be responsible for refining the remanufacturing procedures and test procedures for the EAC. The Contractor shall be responsible for maintaining configuration changes to the EAC down to the shop replaceable unit (SRU) and component level and updating the technical data package (TDP) accordingly.
| Sep 20, 2025 | [Sources Sought (Original)] Elevon Actuator Controller (EAC) Remanufacture |

With GovernmentContracts, you can:
Follow HOSE Active Contract Opportunity Notice ID N0010426QAB74 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/26/2026
Follow 41--FAN,VANEAXIAL Active Contract Opportunity Notice ID SPE8E726T2698 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow HUGHES OR EQUAL T LINE HARDWARE Active Contract Opportunity Notice ID 89503426QWA001270
ENERGY, DEPARTMENT OF
Bid Due: 6/08/2026
Follow 39--HOIST,CHAIN Active Contract Opportunity Notice ID SPE8EE26T1715 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/08/2026