ITB 26-UT-024
|
| Bid Title: |
CONSTRUCTION SERVICES FOR WELL NO. 3 AT WATER TREATMENT FACILITY #2 - REBID
|
| Category: | Professional Services |
| Status: | Open |
|
| City of Mount Dora Water Treatment Plant No. 2 Well No. 3 Mount Dora, Florida SPECIFICATIONS prepared for: prepared by: 902 North Sinclair AvenueTavares,Florida 32778 Phone (352) 343-8481 Halff Project No. 057806.028 Bid No. #### July 2026 100% Bid Set | ||
City of Mount Dora
Water Treatment Plant
No. 2 Well No. 3
Mount Dora, Florida
SPECIFICATIONS
prepared for:
prepared by:
902 North Sinclair AvenueTavares,Florida 32778
Phone (352) 343-8481
Halff Project No. 057806.028
Bid No. ####
July 2026
100% Bid Set
TABLE OF CONTENTS
CITY OF MOUNT DORA
WATER TREATMENT PLANT NO. 2 WELL NO. 3
SPECIFICATIONS
DIVISION ONE-GENERAL REQUIREMENTS
Section 01000 - Project Requirements
Section 01025 - Measurement & Payment
Section 01027 - Applications for Payment
Section 01050 - Field Engineering
Section 01065 - Permits and Fee's
Section 01070 - Abbreviations & Symbols
Section 01100 - Special Project Procedures
Section 01200 - Project Meetings
Section 01310 - Progress Schedules
Section 01340 - Shop Drawings, Work Drawings & Samples
Section 01370 - Schedule of Values
Section01380 - Construction Photography & Videos
Section 01410 - Testing & Testing Laboratory Services
Section 01500 - Temporary Facilities
Section 01505 - Mobilization
Section 01568 - Temporary Erosion Control
Section 01600 - Material and Equipment
Section 01650 - Start-up and Demonstration
Section 01700 - Contract Close-out
Section 01710 - Cleaning
Section 01720 - Project Record Documents
Section 01730 - Operating & Maintenance Data
Section 01740 - Warranties & Bonds
DIVISION TWO-SITE WORK/MATERIALS
Section 02110 - Clearing, Grubbing and Stripping
Section 02140 - Dewatering
Section 02200 - Earthwork
Section 02210 - Site Grading
Section 02212 - Finish Grading
Section 02220 - Excavation, Backfilling, and Grading
Section 02822 - Solid Sodding
Section 02950 - Hot Mix Asphaltic Concrete Paving
DIVISION NINE-FINISHES
Section 09900 - Painting
DIVISION ELEVEN-BUILT-IN EQUIPMENT
Section 11210 - Water Pumps
Section 11215 - Vertical Turbine WellPumps
DIVISION THIRTEEN-SPECIAL CONSTRUCTION
Section 13300 - Process Instrumentation and Control System General Requirements
Section 13310 - Process Instrumentation and Control System FieldInstruments
Section 13320 - Process Instrumentation and Control SystemHuman-Machine Interface (HMI) System
Section 13326 - Process Instrumentation and Control SystemProgramming
Table of Contents-1
DIVISION FIFTEEN-MECHANICAL
Section 15000 - Mechanical-General Requirements
Section 15062 - Ductile Iron Pipe
Section 15100 - Valves and Appurtenances
Section 15101 - Gate Valves
Section 15110 - Check Valves
Section 15116 - Valve Boxes
Section 15122 - Air Release Valves
DIVISION SIXTEEN-ELECTRICAL
Section 16050 - General Provisions
Section 16108 - Miscellaneous Equipment
Section 16110 - Raceways and Fittings
Section 16120 - Wires and Cables
Section 16150 - Motors
Section 16450 - Grounding System
Section 16500 - Lighting System
Appendix A-Scope of Supply, WTP DFS Migration, City of Mount Dora, Prepared by Process Control Services
Table of Contents-2
SECTION 01000
PROJECT REQUIREMENTS
PART 1 -GENERAL
1.01 DESCRIPTION
A. Specifications: The Technical Specifications consist of three (3) parts: General, Products, and Execution.
The General part of a Specification contains GeneralRequirements which govern the Work. The Products
and Execution parts modify and supplement the General Requirements by detailed requirements for the
Work and shall always govern whenever there appears to be a conflict.
B. Scope of Work:
1. The Work to be done consists of the furnishing of all labor, materials, and equipment, and the
performance of all Work included in this Contract.
2. Work Included:
a. The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat,
fuel, water, tools, appliances, equipment, supplies, and means of construction necessary
for proper performance and completion of the Work. The Contractor shall obtain and pay
for all necessary local building permits. The Contractor shall perform and complete the
Work in the manner best calculated to promote rapid construction consistent with safety
of life and property and to the satisfaction of the Engineer, and in strict accordance with
the Contract Documents. The Contractor shall clean up the Work and maintain it during
and after construction, until accepted, and shall do all Work and pay all costs incidental
thereto. He shall repair or restore all structures and property that may be damaged or
disturbed during performance of the Work.
b. The cost of incidental work described in these Project Requirements, for which there are
no specific Contract Items, shall be considered as part of the general cost of doing the
Work and shall be included in the prices for the various Contract Items. No additional
payment will be made, therefor.
c. The Contractor shall provide and maintain such modern plant, tools, and equipment as
may be necessary, in the opinion of the Engineer, to perform in a satisfactory and
acceptable manner all the Work required by this Contract. Only equipment of established
reputation and proven efficiency shall be used. The Contractor shall be solely responsible
for the adequacy of his workmanship, materials, and equipment, prior approval of the
Engineer notwithstanding.
3. Public Utility Installations and Structures:
a. Public utility installations and structures shall be understood to include all poles, tracks,
pipes, wires, conduits, vaults, manholes, and all other appurtenances and facilities
pertaining thereto whether owned or controlled by the Owner, other governmental bodies,
or privately owned by individuals, firms, or corporations, used to serve the public with
transportation, traffic control, gas, electricity, telephone, sewerage, drainage, water, or
other public or private property which may be affected by the Work shall be deemed
included hereunder.
01000-1
b. The Contract Documents contain data relative to existing public utility installations and
structures above and below the ground surface. These data are not guaranteed as to their
completeness or accuracy, and it is the responsibility of the Contractor to make his own
investigations to inform himself fully of the character, condition, and extent of all such
installations and structures as may be encountered and as may affect the construction
operations.
c. The Contractor shall protect all public utility installations and structures from damage
during the Work. Access across any buried public utility installation or structure shall be
made to avoid any damage to these facilities. All required protective devices and
construction shall be provided by the Contractor at his expense. All existing public utilities
damaged by the Contractor shall be repaired by the Contractor, at his expense. No
separate payment shall be made for such protection or repairs to publicutility installations
or structures.
d. Public utility installations or structures owned or controlled by the Owner or other
governmental body, which are shown on the Drawings to be removed, relocated, replaced,
or rebuilt by the Contractor, shall be considered as a part of the general cost of doing the
Work and shall be included in the prices bid for the various Contract Items. No separate
payment shall be made therefor.
e. Where public utility installations of structures owned or controlled by the Owner or other
governmental body are encountered during the course of the Work, and are not indicated
on the Drawings or in the Specifications, and when, in the opinion of the Engineer,
removal, relocation, replacement, or rebuilding is necessary to complete the Work under
this Contract, such Work shall be accomplished by the utility having jurisdiction, or such
Work may be ordered, in writing by the Engineer, for the Contractor to accomplish. If such
work is accomplished by the utility having jurisdiction it will be carried out expeditiously,
and the Contractor shall give full cooperation to permit the utility to complete the removal,
relocation, replacement, or rebuilding as required. If the Contractor accomplishes such
work, it will be paid for as extra work as provided in the Agreement.
f. The Contractor shall, at all times in performance of the Work, employ acceptable methods
and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage,
or destruction of public utility installations and structures; and shall, at all times in the
performance of the Work, avoid unnecessary interference with, or interruption of, public
utility services, and shall cooperate fully with the owners thereof to that end.
g. The Contractor shall give written notice to Owner and other governmental utility
departments and other owners of public utilities of the location of his proposed
construction operations, at least 48-hours in advance of breaking ground in any area or
on any unit of the Work.
h. The maintenance, repair, removal,relocation, or rebuilding of public utility installations and
structures, when accomplished by the Contractor as herein provided, shall be done by
methods approved by the owners of such utilities.
1.02 DRAWINGS AND PROJECT MANUAL
A. Drawings: When obtaining data and information from the Drawings, figures shall be used in preference
to scaled dimensions, and large-scale drawings in preference to small-scale drawings.
B. Supplementary Drawings:
01000-2
1. When, in the opinion of the Engineer, it becomes necessary to explain more fully the Work to be
done or to illustrate the Work further or to show any changes which may be required, drawings
known as Supplementary Drawings, with specifications pertaining thereto, will be prepared by the
Engineer, and the Contractor will be furnished one (1) complete set of reproducible black-line
bond copies (24 inches by 36 inches) and one (1) reproducible copy of the Project Manual.
2. The Supplementary Drawings shall be binding upon the Contractor with the same force as the
Contract Drawings. Where such Supplementary Drawings require either less or more than the
estimated quantities of Work, credit to the Owner or compensation therefor to the Contractor shall
be subject to the terms of the Agreement.
C. Contractor to Check Drawings and Data:
1. The Contractor shall verify all dimensions, quantities, and details shown on the Drawings,
Supplementary Drawings, Schedules, Specifications, or other data received from the Engineer,
and shall notify him of all errors, omissions, conflicts, and discrepancies found therein. Failure to
discover or correct errors, conflicts, or discrepancies shall not relieve the Contractor of full
responsibility for unsatisfactory work, faulty construction, or improper operation resulting
therefrom, nor from rectifying such conditions at his own expense. He will not be allowed to take
advantage of any errors or omissions, as full instructions will be furnished by the Engineer, should
such errors or omissions be discovered.
2. All schedules are given for the convenience of the Engineer and the Contractor and are not
guaranteed to be complete. The Contractor shall assume all responsibility of the making of
estimates of the size, kind, and quality of materials and equipment included in work to be done
under the Contract.
D. Specifications:
1. The Technical Specifications consist of three (3) parts: General, Products, and Execution. The
General part of a Specification contains General Requirements which govern the Work. The
Products and Execution parts modify and supplement the General Requirements by detailed
requirements for the Work and shall always govern whenever there appears to be a conflict.
E. Intent:
1. All Work called for in the Specifications applicable to this Contract, but not shown on the Drawings
in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work
not specified in either the Drawings or in theSpecifications butinvolved in carrying out their intent
or in the complete and proper execution of the Work, is required and shall be performed by the
Contractor as though it were specifically delineated or described.
2. The apparent silence of the Specifications as to any detail, or the apparent omission from them
of a detailed description concerning any work to be done and materials to be furnished, shall be
regarded as meaning that only the best general practice is to prevail and that only material and
workmanship of the best quality is to be used, the interpretation of these Specifications shall be
made upon that basis.
1.03 MATERIALS AND EQUIPMENT
A. Manufacturer:
1. All transactions with the manufacturers or subcontractors shall be through the Contractor, unless
the Contractor shall request and at the Engineer's option, that the manufacturer or subcontractor
01000-3
deal directly with the Engineer. Any such transactions shall not in any way release the Contractor
from his full responsibility under this Contract.
2. Any two (2) or more pieces of material or equipment of the same kind, type, or classification, and
being used for identical types of service, shall be made by the same manufacturer.
B. Delivery:
1. The Contractor shall deliver materials in ample quantities to ensure the most speedy and
uninterrupted progress of the Work so as to complete the Work within the allotted time.
2. The Contractor shall also coordinate deliveries in order to avoid delay in, or impediment of, the
progress of the work of any related Contractor.
C. Tools and Accessories:
1. The Contractor shall, unless otherwise stated in the Contract Documents, furnish with each type,
kind, or size of equipment, one (1) complete set of suitably marked high grade special tools and
appliances which may be needed to adjust, operate, maintain, or repair the equipment. Such tools
and appliances shall be furnished in approved painted steel cases, properly labeled and equipped
with good grade cylinder locks and duplicate keys.
2. Spare parts shall be furnished as specified herein and as recommended by the manufacturer
necessary for the operation of the equipment, not including materials required for routine
maintenance.
3. Each piece of equipment shall be provided with a substantial nameplate, securely fastened in
place and clearly inscribed with the manufacturer's name, year of manufacture, serial number,
weight, and principal rate data.
D. Service of Manufacturer's Engineer:
1. The Contract Prices for equipment shall include the cost of furnishing a competent and
experienced engineer or superintendent who shall represent the manufacturer and shall assist
the Contractor, when required, to install, adjust, test, and place in operation, the equipment in
conformity with the Contract Documents.
2. After the equipment is placed in permanent operation by the Owner, such engineer or
superintendent shall make all adjustments and tests required by the Engineer to prove that such
equipment is in proper and satisfactory operating condition, and shall instruct such personnel as
may be designated by the Owner in the proper operation and maintenance of such equipment.
1.04 INSPECTION AND TESTING
A. General:
1. For tests specified to be made by the Contractor, the testing personnel shall make the necessary
inspections and tests, and the reports thereof shall be in such form as will facilitate checking to
determine compliance with the Contract Documents. Electronic copies shall be submitted, and
authoritative certification thereof must be furnished to the Engineer as a prerequisite for the
acceptance of any material or equipment.
2. If, in the making of any test of any material or equipment, it is ascertained by the Engineer that
the material or equipment does not comply with the Contract Documents, the Contractor will be
notified thereof, and he will be directed to refrain from delivering said material or equipment, or to
remove it promptly from the site or from the Work and replace it with acceptable material, without
cost to the Owner.
01000-4
3. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance
with the recognized test codes of the ANSI, ASME, or the IEEE, except as may otherwise be
stated herein.
4. The Contractor shall be fully responsible for the proper operation of equipment during testing and
instruction periods and shall neither have nor make any claim for damage which may occur to
equipment prior to the time when the Owner formally takes over the operation thereof.
B. Costs:
1. All inspection and testing of materials furnished under this Contract will be provided by the
Contractor, unless otherwise expressly specified.
2. The cost of shop and field tests of equipment and of certain other tests specifically called for in
the Contract Documents shall be borne by the Contractor, and such costs shall be deemed to be
included in the Contract Price.
3. Materials and equipment submitted by the Contractor, as the equivalent to those specifically
named in the Contract, may be tested by the Owner for compliance. The Contractor shall
reimburse the Owner for the expenditures incurred in making such tests of materials and
equipment which are rejected for non-compliance.
C. Certificate of Manufacture:
1. Contractor shall furnish to Engineer authoritative evidence in the form of a certificate of
manufacture that the materials to be used in the Work have been manufactured and tested in
conformity with the Contract Documents.
2. These certificates shall be notarized and shall include copies of the results of physical tests and
chemical analyses, where necessary, that have been made directly on the product or on similar
products of the manufacturer.
D. Shop Test:
1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance,
function, or special requirements are specified shall be tested in the shop of the maker in a manner
which shall conclusively prove that its characteristics comply fully with the requirements of the
Contract Documents.
2. Electronic copies of the manufacturer's actual test data and interpreted results thereof,
accompanied by a certificate of authenticity sworn to by a responsible official of the manufacturing
company and/or independent laboratory, shall be submitted to the Engineer for approval.
3. The cost of shop tests and of furnishing manufacturer's preliminary and shop test data of operating
equipment shall be borne by the Contractor.
E. Start-ups Tests:
1. As soon as conditions permit, the Contractor shall furnish all labor, materials, and instruments
and shall make start-up tests of equipment.
2. If the start-up tests disclose any equipment furnished under this Contract which does not comply
with the requirements of the Contract Documents, the Contractor shall, prior to demonstration
tests, make all changes, adjustments, and replacements required.The furnishing Contractor shall
assist in the start-up tests as applicable.
F. Demonstration Tests:
01000-5
1. Prior to Contractor's request for a Substantial Completion inspection, all equipment and piping
installed under this Contract shall be subjected to demonstration tests as specified or required to
prove compliance with the Contract Documents.
2. The Contractor shall furnish labor, fuel, energy, water, chemicals, and all other materials,
equipment, and instruments necessary for all demonstration tests, at no additional cost to the
Owner. Contractor shall assist in the demonstration tests as applicable.
1.05 LINES AND GRADES
A. Grade:
1. All work under this Contract shall be constructed in accordance with the lines and grades shown
on the Drawings, or as given by the Engineer. The full responsibility for keeping alignment and
grade shall rest upon the Contractor.
2. Adjustments of grades shown on Drawings may be necessary to conform to actual field conditions
or to maintain cover under proposed future grades. Such adjustments shall be considered part
of the job conditions and no extra compensation will be allowed for such changes, except where
specifically noted in the Drawings or Specifications. Such adjustments must be approved by the
Engineer prior to being made.
3. The Engineer will establish bench marks and baseline controlling points. Reference marks for
lines and grades as the Work progresses will be located by the Contractor to cause as little
inconvenience to the prosecution of the Work as possible. The Contractor shall so place
excavation and other materials as to cause no inconvenience in the use of the reference marks
provided. He shall remove any obstructions placed by him contrary to this provision.
B. Surveys:
1. The Contractor shall furnish and maintain, at his own expense, stakes and other such materials.
2. The Contractor shall check such reference marks by such means as he may deem necessary
and, before using them, shall call the Engineer's attention to any inaccuracies.
3. The Contractor shall, at his own expense, establish all working or construction lines and grades
as required from the reference marks set by the Engineer, and shall be solely responsible for the
accuracy thereof. He shall, however, be subject to the check and review by the Engineer.
C. Safeguarding Marks:
1. The Contractor shall safeguard all points, stakes, grade marks, monuments, and bench marks
made or established on the Work, bear the cost of re-establishing them if disturbed, and bear the
entire expense of rectifying work improperly installed due to not maintaining or protecting or to
removing without authorization such established points, stakes, and marks.
2. The Contractor shall safeguard all existing and known property corners, monuments, and marks
adjacent to but not related to the Work and shall bear the cost of re-establishing them if disturbed
or destroyed.
PART 2- PRODUCTS (NOT USED)
PART 3- EXECUTION (NOT USED)
END OF SECTION
01000-6
SECTION 01010
SUMMARY OF PROJECT
PART 1 -GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. This Contract is for the construction of the City of Mount Dora, Water Treatment Plant No. 2 Well No.
3,as shown on the Drawings and specified herein. The Work consists of furnishing all labor, equipment,
and materials for the construction of the facilities consisting of, but not limited to, the following:
B. The Contractor shall furnish all labor equipment, tools, services and incidentals to complete all work
required by these specifications and as shown on the Drawings.
C. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall
include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages
caused during this construction.
D. All materials, equipment, skills, tools and labor which is reasonably and properly inferable and necessary
for the proper completion of the work in a substantial manner and in compliance with the required stated
or implied by these specifications or drawings shall be furnished and installed by the Contractor without
additional compensation, whether specifically indicated in the Contract Documents or not.
E. The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are
applicable to this project.
1.02 CONTRACTOR'S USE OF PREMISES
A. The Contractor shall assume full responsibility for the protection and safekeeping of products and
materials at the job site. If additional storage or work areas are required, they shall be obtained by the
Contractor at no additional cost to the Owner.
1.03 PUBLIC UTILITY INSTALLATIONS AND STRUCTURES
A. The Contractor shall give written notice to all individual property owners, Government utility departments
and other owners of public utilities of the location of the proposed construction operations, at least forty-
eight hours in advance of breaking ground in any area or on any unit of the work.
B. This can be accomplished by making the appropriate contact with the Utility companies identified in the
construction Drawings and calling Sunshine One Call: 1-800-432-4770 for utility locations.
C. The maintenance, repair, removal, relocation or rebuilding of the public utility installation and structures,
when accomplished by the Contractor as herein provided, shall be done by methods approved by the
utility involved.
1.04 WORK SEQUENCE
A. The Contractor shall establish his work sequence based on the use of crews to facilitate completion of
construction and testing within the allotted Contract time.
01010-1

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions WATER/WASTEWATER TREATMENT PLANT... SERVICE 991-730-000-0000 SEWAGE ...
State Government of Florida
Bid Due: 10/11/2040
...Water Resources Improvement Program Secondary Contact Number ITB# CIP/260955 Tertiary Contact Type.../260955 Water ...
City of Ocala
Bid Due: 10/20/2026
...Advertisement Detail Department of Transportation Agency Decisions WATER LINES SERVICES... at 01:14:37 P.M. ...
State Government of Florida
Bid Due: 11/12/2040
...Advertisement Detail Department of Transportation Agency Decisions Maintenance of Water Treatment...
State Government of Florida
Bid Due: 10/11/2080