| Location: | Pennsylvania |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Apr 8, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Montrose Municipal Authority, Susquehanna County |
| Publication URL: | To access bid details, please log in. |
Project Description: The New S.R. 706 Sewer Pump Station consist of constructing the new S.R. 706 Pump Station, near MH-35 of the existing Montrose sewer network, to divert flow from the Southeastern Quadrant of the sewer directly to Montrose Wastewater Treatment Plant. The station will come equipped with a wet well, valve/meter chamber, bypass connections, backup generator, control building as well as associated controls and appurtenances. The new force main will carry the flow uphill to a new gravity sewer that will be installed along Park Street to tie into the existing sewer line along Hawley Road. The project will be separated into two contracts, Contract No.1 Structural/Mechanical Work and Contract No.2 Electrical Work.

With GovernmentContracts, you can:
..., State: Schuylkill County, PA Design Firm: ARRO Consulting, Inc. Project Description: The ...
PennBid
Bid Due: 12/16/2026
...-the-wet construction methods are required. Design, fabrication, and installation of two dewatering boxes..., ...
DEPT OF DEFENSE
Bid Due: 11/05/2026
..., State: Berks County, PA Design Firm: SSM Group Project Description: Sealed Bids ...
PennBid
Bid Due: 11/04/2026
...9th 2026, 11:00 PM EST Contract Type: Fixed Fee Contract County, State: Delaware ...
PennBid
Bid Due: 12/09/2026