| Location: | Washington |
|---|---|
| Posted: | Apr 22, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 4/28/25 1:00pm |
Spokane, WA
This project consists of the reconstruction of overlay slabs and concrete channeling, replacement of existing gravity activated flush system with powered flush control system, providing temporary sewer bypass, electrical conduit and conductors, utility service, site lighting, associated electrical wiring, conduit, & panels, relocation of existing flap check valve, reinforced grassed driveway, ventilation pipe repairs, reconstruction of access manholes, sealing CSO tank roof, wall and roof penetrations, and access risers, removal and replacement of concrete curb, steel access gate, and other related miscellaneous items at three combined sewer overflow (CSO) sites.

With GovernmentContracts, you can:
...Bid Number: ENG-22-09 Bid Title: SANITARY SEWER REHABILITATION - INFLOW AND INFILTRATON CORRECTION... ...
Oak Harbor city
Bid Due: 7/01/2026
...Bid Number: ENG-22-09 Bid Title: SANITARY SEWER REHABILITATION - INFLOW AND INFILTRATON CORRECTION... ...
Oak Harbor city
Bid Due: 7/02/2026
...Project: Engineering RFQ Ref. #: 20260615 Department: Lake Stevens Sewer District Type: RFQ ...
Sammamish Plateau Water
Bid Due: 7/10/2026
...square yards of pavement repair excavation, 920 linear feet of storm sewer, 27 ...
City of Spokane
Bid Due: 6/29/2026