Church Street Mobility Enhancement Project

Location: California
Posted: Jul 9, 2025
Due: Aug 6, 2025
Agency: Stanislaus Council of Governments
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Church Street Mobility Enhancement Project

Addenda: 0

Release Date: 7/9/2025

Due Date: 8/6/2025

Post Information
Posted At:Wed, Jul 9, 2025 3:00 PMSealed Bid Process:NoPrivate Bid:No
Overview
Summary

The Stanislaus Council of Governments (hereinafter called StanCOG) is soliciting proposals from qualified consultant firms to provide project approval / environmental document (PA&ED); plans, specifications and estimate (PS&E); right of way acquisition and utility relocation; and design support through construction services for the Church Street Mobility Enhancement Project (Project). The successful proposer will be a full-service team that can provide complete, turnkey services

Background

Project Scope Summary The Church Street Mobility Enhancement Project (Project) will create a new pedestrian network in the disadvantaged community of Empire in Stanislaus County, enhancing safety for all users and increasing active transportation access to schools, parks, the post office, neighborhood grocery, and other retail. The Project will address pedestrian deficiencies identified in the Stanislaus County Community Transportation Needs Assessment prepared in 2021-2022. The assessment identified deficiencies on Church Street, 1st Street, and 2nd Street, with each street providing one travel lane in each direction with on-street parking (paved and unpaved) which have limited pedestrian facilities or no pedestrian facilities. In fact, no sidewalks exist on most of Church Street, 1st Street, and 2nd Street. On the three segments of Church Street where sidewalks do exist, there are barriers to accessible path of travel resulting from non-compliant driveways and obstructions (mailboxes, utility and sign poles). There are accessible ramps and crosswalks at some intersections, but the current design has not been sufficient to overcome resident concerns of excessive speeds along with unsafe crossings of Church Street. Street lighting is sparse or nonexistent and is insufficient for visibly safe nighttime walking. Streetscape landscaping is not present along the corridor. Church Street, 1st Street, and 2nd Street are the primary access points to Empire Elementary School, Empire Regional Park and other public facilities and private businesses. The lack of adequate facilities has discouraged pedestrian activity in the community. The Project will transform the pedestrian environment on key streets in Empire as follow: • Install over 1 mile of new sidewalks along Church Street, 1st Street, and 2nd Street. • Remove and replace ADA non-compliant driveways and sidewalk obstruction on Church Street, 1st Street, and 2nd Street. • Install curb extensions, neckdowns, high visibility crosswalks, flashing stop signs, and rapid flash beacons to improve safety and visibility at crossings, slow traffic on Church Street, and increase driver awareness of pedestrians. • Install street lighting to facilitate nighttime walking. • Install decorative paving at key locations to enhance the pedestrian environment. • Install new curb and gutter where not present. • Replace non-compliant gutters on 1st Street and 2nd Street for vertical separation between the road surface and new sidewalk. • Install drainage improvements with new sidewalks to create positive drainage and avoid ponding of water in the street; and • Construct asphalt rehabilitation where needed to accommodate new and replacement gutter pans and curb extensions. The completed Project will enhance safety for all users and increase active transportation access to schools, parks, other public facilities, neighborhood grocery, and other retail businesses.

Timeline
Release Project Date:
July 9, 2025
Question Submission Deadline:
July 23, 2025, 3:00pm
Question Response Deadline:
July 30, 2025, 5:00pm
Proposal Submission Deadline:
August 6, 2025, 3:00pm
Contractor Selection Date:
October 13, 2025
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Retail Space to Lease - Simi Valley Active Contract Opportunity Notice ID ...

DEPT OF DEFENSE

Bid Due: 6/05/2026

...a portfolio of Zone 7 infrastructure, construction, and repair projects . Proposals must ...

Zone 7 Water Agency

Bid Due: 6/18/2026

...not return to open retail status. * Provide additional funding for stations awarded ...

California Energy Commission

Bid Due: 6/19/2026

...temporarily non-operational (TNO) stations that would otherwise not return to open retail status. ...

California Energy Commission

Bid Due: 7/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.