| Location: | South Carolina |
|---|---|
| Posted: | Aug 27, 2025 |
| Due: | Sep 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H59-N343-PD |
| Publication URL: | To access bid details, please log in. |
Remove approximately 19,634 SF of existing aggregate surfaced built up roof assembly down to the existing metal decking, prepare metal decking to receive new roofing and install new flat and tapered rigid insulation, cover board, modified bitumen roofing assembly, metal, bituminous, PVC and liquid applied flashings, and all associated miscellaneous work as specified.

With GovernmentContracts, you can:
...Project: Design/Build Services for Bees Ferry Animal Services Emergency Procurement Ref. #: RFP... ...
Charleston County
Bid Due: 11/24/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $150,000.00 - $250,000.00 Agency... is a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/04/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $225,000 TO $275,000 Prime Contractor License... (Special ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/03/2026
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 1/05/2027