| Location: | California |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 35399-CP1513 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Wasserman OR Booster Chiller Installation (opens in new tab, PDF) |
| Project Number | 35399-CP1513 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:
The scope of work for this project includes the furnishing and installing of new booster chiller equipment and associated pumps to serve the existing AHU-3 at the Wasserman Building mechanical penthouse. The work also includes replacement of the existing cooling coil and humidifier dispersion tubes serving AHU-3, along with all required mechanical, electrical, controls, support, and testing work needed to place the system into operation. Mechanical scope includes furnishing and installing a new water-cooled chiller, new chilled water pumps, buffer tank, and related piping and accessories required for the new chilled water system. The existing cooling coil and humidifier dispersion tubes serving AHU-3 will be replaced. The project will also include testing and balancing by an independent AABC-certified agent. Electrical scope includes providing a new electrical panel to serve the new equipment as required. The new panel will be fed from an existing switchboard located on the lower level of the building. New electrical conduits and supports will be routed from the lower level up to the penthouse to provide power to the new equipment and associated accessories. Architectural/demo scope includes temporary removal and replacement of existing ceiling tiles and grid as needed to provide new conduits and supports. Existing hard-lid ceiling areas will also be demolished where required to support conduit routing and installation. Since electrical conduits will be routed vertically through the building shaft, the shaft area will be accessed as needed to complete the conduit installation from the lower level to the penthouse. The work area is primarily located on the west side of the roof within the mechanical penthouse, with additional work on the fifth level and lower level as required for conduit routing, electrical connections, and access to existing building infrastructure. Due to the sensitive and occupied nature of the facility, all project work shall be performed during nighttime hours, except for work within the roof penthouse, which may be performed during normal working hours. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $600,000.00 |

With GovernmentContracts, you can:
...Follow Maintenance and repair of pumps and compressors at Active Contract Opportunity Notice ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/30/2026
...Project ID: Title: Industrial Pump Maintenance and Repair Addenda: 1 Release Date: 6/22/2026 ...
Las Virgenes Municipal Water District
Bid Due: 7/30/2026
...Follow IRV Exhaust and Vacuum Pump Replacement Active Contract Opportunity Notice ID...), is ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/14/2026
...Follow IRV Exhaust and Vacuum Pump Replacement Active Contract Opportunity Notice ID... Pump ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/14/2026