| Location: | Florida |
|---|---|
| Posted: | Sep 23, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N6945024R0084 |
| Publication URL: | To access bid details, please log in. |
This project will replace the primary and secondary electrical distribution system, lighting, and nine (9) transformers with switchgears, and power & telecommunication igloos infrastructure for six (6) substations at ECHO, ALPHA, BRAVO, and DELTA wharves to meet the full shore power requirements of various naval ships; demolish one (1) existing substation building vulnerable to storm surge flooding; and build a new elevated substation. The goal of this project is ensuring individual ships meet the full shore power requirements with new transformer & igloo pairs and switchgears to provide greater electric load with twelve receptacles capacity.

With GovernmentContracts, you can:
...power outages and electrical disturbances. Routine preventative maintenance and timely repairs... Project ID: ...
City of Port St. Lucie
Bid Due: 6/17/2026
...ELECTRICAL DISTRIBUTION SYSTEM TO PROVIDE ADDITIONAL ELECTRICAL STANDBY POWER CAPACITY FOR THE SITE...
Volusia County Schools
Bid Due: 7/15/2026
...Summary The purpose of this project is to remove the existing emergency power ...
City of Dania Beach
Bid Due: 6/08/2026
...Summary The purpose of this project is to remove the existing emergency power ...
City of Dania Beach
Bid Due: 6/08/2026