| Location: | Florida |
|---|---|
| Posted: | Sep 23, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N6945024R0084 |
| Publication URL: | To access bid details, please log in. |
This project will replace the primary and secondary electrical distribution system, lighting, and nine (9) transformers with switchgears, and power & telecommunication igloos infrastructure for six (6) substations at ECHO, ALPHA, BRAVO, and DELTA wharves to meet the full shore power requirements of various naval ships; demolish one (1) existing substation building vulnerable to storm surge flooding; and build a new elevated substation. The goal of this project is ensuring individual ships meet the full shore power requirements with new transformer & igloo pairs and switchgears to provide greater electric load with twelve receptacles capacity.

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions Purchase of Portable Wheel Load...
State Government of Florida
Bid Due: 10/11/2090
...Bid Number: 26-18 Bid Title: ITB 26-18 GENERATOR REPAIR, PREVENTATIVE MAINTENANCE AND LOAD ...
City of Lake Wales
Bid Due: 9/24/2026
...Project ID: Title: CONSULTING SERVICES FOR THE PREPARATION OF A DATA CENTER AND ...
City of Lakeland
Bid Due: 10/05/2026
...volume to be hauled is an estimated 51,000 pounds (about 25.5 net tons) ...
City of North Miami Beach
Bid Due: 9/28/2026