| Location: | Florida |
|---|---|
| Posted: | Sep 23, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N6945024R0084 |
| Publication URL: | To access bid details, please log in. |
This project will replace the primary and secondary electrical distribution system, lighting, and nine (9) transformers with switchgears, and power & telecommunication igloos infrastructure for six (6) substations at ECHO, ALPHA, BRAVO, and DELTA wharves to meet the full shore power requirements of various naval ships; demolish one (1) existing substation building vulnerable to storm surge flooding; and build a new elevated substation. The goal of this project is ensuring individual ships meet the full shore power requirements with new transformer & igloo pairs and switchgears to provide greater electric load with twelve receptacles capacity.

With GovernmentContracts, you can:
...Title Specifications for Purchase of Transformers Secondary Contact Number 20-26 Tertiary Contact Type... ...
Keys Energy Services
Bid Due: 10/16/2026
...SERVICE FEEDERS BACK TO UTILITY TRANSFORMER. . 2. REPLACE DISTRIBUTION PANEL 'P4' AND ...
Volusia County Schools
Bid Due: 10/15/2026
...FEEDERS BACK TO UTILITY TRANSFORMER. ADD BREAKER TO CONNECT EM1 TO MDP. 2. ...
Volusia County Schools
Bid Due: 10/15/2026
...MDP IN BUILDING 4 AND SERVICE FEEDERS BACK TO UTILITY TRANSFORMER. . 2. ...
Volusia County Schools
Bid Due: 10/15/2026