| Location: | Connecticut |
|---|---|
| Posted: | Apr 8, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 35994 |
| Publication URL: | To access bid details, please log in. |
FACILITY-WIDE KEYLESS ACCESS SYSTEM AT THE WINDHAM WATER WORKS
The work encompasses the furnishing of all labor, materials, equipment and supervision for installation and programming of a facility-wide keyless access system suitable for all exterior man doors across four buildings at the Windham Water Works. The proposed system shall be scalable to allow for the incorporation of locks and doors on any future structures that may be built at the treatment facility.
Christian Perez Windham Water Works 174 Storrs Road Mansfield Center CT, 06250 United States Tel: 8604653086 Ext: 2022 cperez@windhamwaterworks.com

With GovernmentContracts, you can:
...Bid Number: 2026-011 Bid Title: Purchase of Water Treatment Chemicals Category: Term Bids/One ...
City of Middletown
Bid Due: 7/14/2026
...-faaea1d32522 Fluoride System Improvements at the Lake Gaillard Water Treatment Plant Fluoride System... ...
Regional Water Authority
Bid Due: 6/30/2026
...-4073d34d4e0c Lake Gaillard Water Treatment Plant Filter Local Control Consoles Upgrade Project Lake... ...
Regional Water Authority
Bid Due: 6/24/2026
...-4073d34d4e0c Lake Gaillard Water Treatment Plant Filter Local Control Consoles Upgrade Project Lake... ...
Regional Water Authority
Bid Due: 6/10/2026