RFB: COUNTY ROAD 35 BRIDGE REPLACEMENT AT WALKER CREEK BR-NBIL(510)

Location: California
Posted: Apr 7, 2026
Due: Apr 30, 2026
Agency: Glenn County
Type of Government: State & Local
Category:
  • Q - Medical Services
Publication URL: To access bid details, please log in.

COUNTY OF GLENN

NOTICE TO BIDDERS

COUNTY ROAD 35 BRIDGE REPLACEMENT AT WALKER CREEK
BR-NBIL(510)

NOTICE IS HEREBY GIVEN that Sealed Bids for the construction of COUNTY ROAD 35 BRIDGE REPLACEMENT AT WALKER CREEK will be received at the Glenn County (COUNTY) office of Public Works Agency, located at 777 North Colusa Street, Willows, CA 95988, until 2:00 P.m. on April 30, 2026. The bids will be publicly opened and read aloud at 2:30 P.m. on April 30, 2026, at the Glenn County office of Clerk of the Board of Supervisors, located at 525 West Sycamore Street, Suite B1, Willows, CA 95988. Bids shall be clearly labeled “COUNTY ROAD 35 BRIDGE REPLACEMENT AT WALKER CREEK BR-NBIL(510).” Bids are required for the entire work described herein. No electronic or faxed bids will be accepted.

The work includes replacement of the existing low water crossing with a new bridge and reconstruction of the approach roadway along County Road 35 at Walker Creek.

A mandatory pre-bid meeting will be held at the Public Works Agency office at 10:00 a.m. on Thursday April 9, 2026.

Questions are due by April 17, 2026 at 5:00 p.m.

Interested firms may download the complete Notice at www.publicpurchase.com , or the following links: Notice to Bidders , Plans

The complete Plans and Notice to Bidders package may also be requested at the Glenn County Public Works Agency (777 N. Colusa St., Willows, CA 95988), by telephone at (530) 934-6530, or by email at engineer@countyofglenn.net .

No bid will be considered unless it is made on the forms furnished by the COUNTY and is made in accordance with the Special Provisions. Each bidder must be licensed as required by law and as described in the contract documents.

The COUNTY reserves the right to reject any or all bids and to determine which Sealed Bid is, in its opinion, the lowest responsive bid of a responsible bidder and that which it deems in the best interest of the COUNTY to accept. The COUNTY also reserves the right to waive any information not material to cost or performance in any Proposal or bid.

Questions shall be directed to:

Talia Richardson – Director

Glenn County Public Works Agency

777 N. Colusa St.

Willows, Ca 95988

(530) 934-6530

engineer@countyofglenn.net

Bid Status
Open
Deadline Date
Thu, 04/30/2026 - 14:00
Public Works

Attachment Preview

COUNTY OF GLENN
PUBLIC WORKS AGENCY
NOTICE TO BIDDERS,
SPECIAL PROVISIONS,
BID BOOK, AND CONTRACT
FOR
CONSTRUCTION ON
COUNTY ROAD 35 BRIDGE
REPLACEMENT AT WALKER CREEK
BRIDGE NO. 11C-0267
FEDERAL AID PROJECT NUMBER: BR-NBIL(510)
DATED: AUGUST 6, 2025
FOR USE IN CONNECTION WITH
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS DATED 2024,
STANDARD PLANS DATED 2024,
CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,
CURRENT LABOR SURCHARGE AND EQUIPMENT RENTAL RATES,
AND
DEPARTMENT OF INDUSTRIAL RELATIONS
GENERAL PREVAILING WAGE RATES
BID OPENING: 2:00 pm Thursday, April 30, 2026

Notice to Bidders
SPECIAL NOTICES
* See sections 2 and 3 for contractors' registration requirements.
* See section 2-1.04 for mandatory prebid meeting requirements.
* The contract award period has been extended for this project. See section 3-1.04.
ii

Notice to Bidders
Project No. BR-NBIL (510)
The special provisions contained herein have been
prepared by or under the direction of the following
Registered Persons.
ROADWAY & STRUCTURES
8-6-25
Registered Civil Engineer
iii
N o . 4 2 ,1 7 6
E R E D R P Y R O M FE . S S GO IO R N D A L E N
T A O G
S G N I
I N
G E
E E R R
S TATE
O
C
F
I
C
V
A
I
L
L IFORNI A

Notice to Bidders
Table of Contents
NOTICE TO BIDDERS ...................................................................................................................................................................................... 1
SPECIAL PROVISIONS ................................................................................................................................................................................... 7
DIVISION I GENERAL PROVISIONS ............................................................................................................................................................ 7
1 GENERAL ................................................................................................................................................................................................... 7
2 BIDDING ................................................................................................................................................................................................... 9
3 CONTRACT AWARD AND EXECUTION ................................................................................................................................................. 10
5 CONTROL OF WORK ................................................................................................................................................................................. 10
6 CONTROL OF MATERIALS ....................................................................................................................................................................... 13
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ......................................................................................................... 14
8 PROSECUTION AND PROGRESS .......................................................................................................................................................... 15
9 PAYMENT ................................................................................................................................................................................................. 15
DIVISION II GENERAL CONSTRUCTION .................................................................................................................................................. 16
10 GENERAL ................................................................................................................................................................................................. 16
12 TEMPORARY TRAFFIC CONTROL....................................................................................................................................................... 16
13 WATER POLLUTION CONTROL ........................................................................................................................................................... 17
14 ENVIRONMENTAL STEWARDSHIP ..................................................................................................................................................... 24
16 TEMPORARY FACILITIES ...................................................................................................................................................................... 30
DIVISION III EARTHWORK AND LANDSCAPE ........................................................................................................................................ 31
17 GENERAL ................................................................................................................................................................................................. 31
19 EARTHWORK ............................................................................................................................................................................................ 31
21 EROSION CONTROL ............................................................................................................................................................................... 32
DIVISION V SURFACINGS AND PAVEMENTS......................................................................................................................................... 33
39 ASPHALT CONCRETE ............................................................................................................................................................................ 33
DIVISION VI STRUCTURES ......................................................................................................................................................................... 34
49 PILING ................................................................................................................................................................................................. 34
51 CONCRETE STRUCTURES .................................................................................................................................................................... 39
60 EXISTING STRUCTURES........................................................................................................................................................................ 40
DIVISION VIII MISCELLANEOUS CONSTRUCTION ............................................................................................................................... 40
72 SLOPE PROTECTION .............................................................................................................................................................................. 40
75 MISCELLANEOUS METAL ..................................................................................................................................................................... 40
80 FENCES ................................................................................................................................................................................................. 41
DIVISION IX TRAFFIC CONTROL DEVICES ............................................................................................................................................. 41
83 RAILINGS AND BARRIERS .................................................................................................................................................................... 41
DIVISION XI MATERIALS ............................................................................................................................................................................. 41
90 CONCRETE................................................................................................................................................................................................ 41
BID BOOK ................................................................................................................................................................................................. 42
CONTRACT ................................................................................................................................................................................................. 66
FEDERALLY REQUIRED CONTRACT LANGUAGE ................................................................................................................................ 75
MINIMUM FEDERAL WAGE RATES DETERMINATIONS ..................................................................................................................... 112
REGULATORY PERMITS AND ENVIRONMENTAL COMMITMENTS ................................................................................................ 113
ADDENDA ............................................................................................................................................................................................... 114
iv

Notice to Bidders
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. When
applicable, revised standard plans (RSPs) listed below are included in the project
plans.
ABBREVIATIONS, LINES, SYMBOLS, AND LEGEND
RSP A3A Abbreviations (Sheet 1 of 3)
A3B Abbreviations (Sheet 2 of 3)
A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT MARKINGS
A20B Pavement Markers and Traffic Lines - Typical Details
EXCAVATION AND BACKFILL
A62A Excavation and Backfill - Miscellaneous Details
A62C Limits of Payment for Excavation and Backfill - Bridge
OBJECT MARKERS, DELINEATORS, CHANNELIZERS, AND BARRICADES
A73B Markers
A73C Delineators, Channelizers, and Barricades
MIDWEST GUARDRAIL SYSTEM - STANDARD RAILING SECTIONS AND
TRANSITION TO METAL BEAM GUARDRAIL
A77L1 Midwest Guardrail System - Standard Railing Section (Wood Post with Wood
Block)
A77M1 Midwest Guardrail System - Standard Hardware
A77N1 Midwest Guardrail System - Wood Post and Wood Block Details
A77N2 Midwest Guardrail System - Steel Post and Block Details
A77N3 Midwest Guardrail System - Typical Line Post Embedment and Hinge Point
Offset Details
MIDWEST GUARDRAIL SYSTEM - TYPICAL LAYOUTS FOR STRUCTURES
A77Q1 Midwest Guardrail System - Typical Layouts for Structure Approach
A77Q4 Midwest Guardrail System - Typical Layouts for Structure Departure
MIDWEST GUARDRAIL SYSTEM - END ANCHORAGE AND RAIL TENSIONING
ASSEMBLY
APPROACH GUARDRAIL TRANSITION (TYPE AGT) - AND DEPARTING
CONNECTIONS - MIDWEST GUARDRAIL SYSTEM AND THRIE BEAM BARRIER
(TYPE M) CONNECTION DETAILS TO BRIDGE RAILINGS, ABUTMENTS, AND
WALLS
A79A1 Transition Railing (Type AGT) to Bridge Railings without Sidewalks
FENCES
A86 Barbed Wire and Wire Mesh Fences
A86D Barbed Wire and Wire Mesh Fence - Miscellaneous Details
PAVEMENTS
P70 Hot Mix Asphalt Paving (Longitudinal Tapered Notched Wedge Joint)
v

Notice to Bidders
P74 Pavement Edge Treatments
P76 Pavement Edge Treatments - New Construction
TEMPORARY WATER POLLUTION CONTROL
T51 Temporary Water Pollution Control Details (Temporary Silt Fence)
T53 Temporary Water Pollution Control Details (Temporary Cover)
T56 Temporary Water Pollution Control Details (Temporary Fiber Roll)
T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout
Facility)
T60 Temporary Water Pollution Control Details (Temporary Reinforced Silt Fence)
BRIDGE DETAILS
B0-1 Bridge Details
B0-3 Bridge Details
B7-5 Deck Drains
BRIDGE METAL RAIL BARRIERS
B11-200 California ST-75 Bridge Rail Details No. 1
B11-201 California ST-75 Bridge Rail Details No. 2
B11-202 California ST-75 Bridge Rail Details No. 3
B11-220 California Bridge Rail ST-75, ST-75SW, ST-76, and ST-76SW Post and Rail
Details
B11-221 California Bridge Rail ST-75, ST-75SW, ST-76, and ST-76SW Rail Splice Details
B11-222 California Bridge Rail ST-75, ST-75SW, ST-76, and ST-76SW Parapet Shoe
Details
ROADSIDE SIGNS
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
vi

Notice to Bidders
NOTICE TO BIDDERS
COUNTY OF GLENN
STATE OF CALIFORNIA
PUBLIC WORK AGENCY
NOTICE IS HEREBY GIVEN THAT sealed bids will be received in the office of the Public Works Agency of the
County of Glenn, 777 North Colusa Street, Willows, California by 2:00 P.M., Thursday, April 30, 2026. Sealed bids
will publicly opened and read aloud at 2:30 P.M., Thursday, April 30, 2026 in the Board of Supervisor's
Conference Room at the Willows Memorial Hall located at 525 West Sycamore Street, Willows, California for:
County of Glenn
Public Works Agency
Bridge Replacement at Walker Creek at County Road 35
Bridge No. 11C-0267, BR-NBIL (510)
Any bid received after the time and date listed above will be returned unopened. Bids are required for the entire
work described in accordance with the provisions of the contract documents on the proposal forms furnished
therein, and in accordance with these Special Provisions and with the Standard Specifications and Standard
Plans published by the State of California Department of Transportation (Caltrans), dated 2024.
DESCRIPTION OF WORK: The work to be done consists, in general, of demolition of the existing concrete low
water crossing and roadway, construction of a new slab bridge supported on CIDH concrete piles, and
reconstruction of the approach roadway.
Bids must be on a unit price basis.
Complete the work within 140 working days.
The Engineer's Estimate for this project is $5,828,000
For the Federal training program, the number of trainees or apprentices is 8.
The DBE contract goals for these projects are: NONE
PRE-BID INFORMATION AND COMMUNICATIONS: A mandatory pre-bid meeting has been scheduled on
Thursday, April 9, 2026 at 10:00 a.m. in the Public Works Agency Conference Room located at 777 North Colusa
Street, Willows, California. Bidders shall address any questions in writing to the County. The County will post the
questions received, along with written responses, to the County website,
[https://www.countyofglenn.net/government/bids]. It is the responsibility of the bidder to check the County
website to review the questions and responses. Except for questions that might render the award of this
contract invalid, the County will not respond to any questions submitted after 5:00 p.m. on Friday, April 17, 2026.
Any oral responses to questions are not binding on the County. Any communications relative to this project shall
be directed in writing to:
Talia Richardson, Director of Public Works
Public Works Agency
777 North Colusa Street
Willows, CA 95988
engineer@countyofglenn.net
1

Notice to Bidders
CONTRACT DOCUMENTS: Plans, specifications, proposal forms, regulatory permits, and reduced plans for
bidding this project may be examined or obtained at the County of Glenn Public Works Agency, 777North Colusa
Street, Willows, California, 95988, until 5:00 P.M. weekdays or by calling (530) 934-6530. A nonrefundable charge
of $150 will be made for each set of specifications and half size plans. A non-refundable charge of $75 will be
made for each set of full size plans.
For an electronic version of this Bid Book, go to: https://www.countyofglenn.net/government/bids. Bidders must
submit bids on proposal forms purchased from the Public Works Agency or downloaded from this site.
UNFAIR ADVANTAGE: No contractor which has provided design services for a project shall be eligible to submit
a proposal for the contract to construct the project or to subcontract for any portion of the work. The County
reserves the right to determine eligibility on a case-by-case basis.
COMPLETION OF WORK: The Bidder is referred to Section 8, "Prosecution and Progress," of these Special
Provisions which allows one hundred 40 (140) working days for completion of the work. Liquidated damages of
six thousand seven hundred dollars ($6,700) per calendar day will be assessed for each day of delay in
completion of the work.
QUANTITY OF WORK: The quantities shown in the proposal forms are approximate only and given as a basis for
the comparison of bids. The County of Glenn does not expressly or by implication assert that the actual amount of
work will correspond herewith and reserves the right to increase or decrease the amount of any portion of the
work or to omit portions of the work as may be deemed necessary.
BID SECURITY: All bids shall be accompanied by cash or a certified or cashier's check payable to the order of
Glenn County Public Works Agency amounting to ten percent (10%) of the bid or a bond in said amount payable
to the County as liquidated damages. Said amount shall be retained by, or said bond shall become payable to,
the County if the bidder depositing same does not, within ten (10) working days after written notice that the
contract has been awarded to it, enter into a contract with the County.
BONDS: The successful bidder shall furnish a payment bond and a performance bond, each in the amount of one
hundred (100) percent of the contract price.
ADDENDUMS TO BID DOCUMENTS: The Engineer may issue addendums to the project plans and
specifications as he deems necessary to modify the project documents prior to opening of bids. Addendums will
be in writing and may modify the content of the project documents as well as the date that bids are accepted by
the County. The County will post any issued addenda to the County website,
https://www.countyofglenn.net/government/bids. It is the responsibility of the bidder to check for any addenda.
LOCAL VENDORS: The County encourages bidders to consider using local vendors when putting together their
proposals. Be advised that the inclusion or exclusion of local vendors will not be taken into consideration when
the County reviews the submitted bid proposals.
CONTRACTOR LICENSE REQUIRED: The successful bidder, before contract award, shall possess a current
Class A Contractor license. Contractor license shall be issued by the State of California Licensing Board. Failure
of the bidder to obtain the required license before award of the contract shall constitute a failure to execute the
contract and shall result in the forfeiture of the security of the bidder.
NON-DISCRIMINATION AND DISADVANTAGED BUSINESS ENTERPRISE (DBE): The contractor, sub recipient
or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this
contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration
of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this
2

Notice to Bidders
contract, which may result in the termination of this contract or such other remedy as the recipient deems
appropriate.
Take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the contract (49
CFR 26).
Bidders are advised that Section 2, "Bidding," under subsection titled "Disadvantaged Business Enterprises
(DBE)," and Section 8, "Prosecution and Progress," of these Special Provisions cover the DBE requirements.
WAGE RATES: Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the County in
which the work is to be done have been determined by the Director of the California Department of Industrial
Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Glenn
County Public Works Agency and available from the California Department of Industrial Relations' Internet web
site at http://www.dir.ca.gov.
The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are
available at https://sam.gov/wage-determinations. Addenda to modify the Federal minimum wage rates, if
necessary, will be issued to holders of the contract documents. Future effective general prevailing wage rates
which have been predetermined and are on file with the California Department of Industrial Relations are
referenced but not printed in the general prevailing wage rates.
Attention is directed to the Federal minimum wage rate requirements in the Bid Book. If there is a difference
between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates
determined by the Director of the California Department of Industrial Relations for similar classifications of labor,
the Contractor and subcontractors shall pay not less than the higher wage rate. The County will not accept lower
State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or
other classifications based on hours of experience) or any other classification not appearing in the Federal wage
determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise
available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than
the Federal minimum wage rate which most closely approximates the duties of the employees in question.
DIR REGISTRATION AND NOTICE: To be qualified to bid on, be listed in a bid proposal or engage in the
performance of any public work contract subject to Labor Code section 1720, contractors and subcontractors
must be registered with the Department of Industrial Relations. Please see http://www.dir.ca.gov/Public-
Works/PublicWorks.html for more information. No contract will be entered into without proof of the contractor's
and subcontractors' current registration with the Department of Industrial Relations to perform public work. If
awarded a contract, the bidder and its subcontractors, of any tier, shall maintain active registration with the
Department of Industrial Relations for the duration of the project.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Each
contractor and subcontractor must furnish certified payroll records to the Labor Commissioner at least monthly.
The County is required to provide notice to DIR of any public work contract subject to prevailing wages within five
(5) days of the award.
BUY AMERICA REQUIREMENT: Attention is directed to the "Buy America" requirements of Title 23 United States
Code, Section 313 and the regulations adopted pursuant thereto.
PAYMENT RETENTION: Upon the Contractor's request, the County will make payment of funds withheld from
progress payments, pursuant to the requirements of Public Contract Code section 22300 if the Contractor
deposits, in escrow with the County Treasurer or with a bank acceptable to the County, securities eligible for the
3

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

City of Monrovia

Bid Due: 8/19/2026

RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

City of Visalia

Bid Due: 9/03/2026

0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

City of Los Angeles

Bid Due: 8/11/2026

RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

County of San Diego

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.