| Location: | Oregon |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 21, 2026 |
| Agency: | Silverton city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The City of Silverton is requesting proposals from qualified consulting engineering firms to provide professional services for an Aquifer Storage and Recovery (ASR) Design and Permitting Study for the municipal water system.
The study shall advance the preferred ASR alternative to an approximate 30 percent design level sufficient to support permitting, budgeting, and future final design and construction activities.
The City has completed feasibility-level investigations including exploratory drilling, aquifer testing, and hydrogeologic evaluations of the Columbia River Basalt Group aquifer system. These efforts have identified potential ASR sites capable of supporting seasonal storage and recovery of potable water supplies.
The purpose of this study is to advance the preferred ASR alternative into preliminary design and permitting, providing the technical, regulatory, operational, and cost information necessary to support future final design and construction.

With GovernmentContracts, you can:
...2026 UO Retainer Program -- Construction Services Campus Planning and Facilities Mgmt > ...
University of Oregon
Bid Due: 9/30/2027
...Project ID: 2026.057-RFP Title: On-Call General Construction Services Pool Addenda: 1 Release Date...: ...
Washington County
Bid Due: 8/27/2026
...Fencing construction project along the South Fork Coquille River Bid Opening Date 08/14/2026 ...
State Government of Oregon
Bid Due: 8/14/2026
...Services for Construction Management of Bond Projects Bid Opening Date 08/21/2026 14:00:00 Bid ...
State Government of Oregon
Bid Due: 8/21/2026