| Location: | Oregon |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 21, 2026 |
| Agency: | Silverton city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The City of Silverton is requesting proposals from qualified consulting engineering firms to provide professional services for an Aquifer Storage and Recovery (ASR) Design and Permitting Study for the municipal water system.
The study shall advance the preferred ASR alternative to an approximate 30 percent design level sufficient to support permitting, budgeting, and future final design and construction activities.
The City has completed feasibility-level investigations including exploratory drilling, aquifer testing, and hydrogeologic evaluations of the Columbia River Basalt Group aquifer system. These efforts have identified potential ASR sites capable of supporting seasonal storage and recovery of potable water supplies.
The purpose of this study is to advance the preferred ASR alternative into preliminary design and permitting, providing the technical, regulatory, operational, and cost information necessary to support future final design and construction.

With GovernmentContracts, you can:
...Consulting Bid Opening Date: 04/30/2027 04:00:00 PM Purchaser: Noel Dietz Organization: City of ...
State Government of Oregon
Bid Due: 4/30/2027
...2026 UO Retainer Program -- Consulting Services Campus Planning and Facilities Mgmt > ...
University of Oregon
Bid Due: 9/30/2027
...Consulting Services (QEP) Bid Opening Date 08/07/2026 17:00:00 Bid Holder List Awarded Vendor(s) ...
State Government of Oregon
Bid Due: 8/07/2026
...Project: Request for Qualifications for On-Call Utility and Infrastructure Financial Consulting... proposals from ...
City of Milwaukie
Bid Due: 8/20/2026