| Location: | Washington |
|---|---|
| Posted: | Jun 24, 2026 |
| Due: | Jul 29, 2026 |
| Agency: | City of Seattle |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PW#2025-017 |
| Publication URL: | To access bid details, please log in. |
Project ID: PW#2025-017
Title: 45th Ave SW Culvert Replacement and Habitat Restoration
Addenda: 0
Release Date: 6/24/2026
Due Date: 7/29/2026
Project Description: This Project will replace the 45 th Ave SW culvert and consists of the following elements of Work: civil demolition to include an in-stream by-pass, tree protection, civil site work, civil stream work, civil grading, civil utilities (drainage and water), civil paving (roadway), landscaping, structural work (soldier pile shoring, culvert construction consisting of cast-in-place concrete footings, shotcrete walls, and precast concrete cover), and electrical.
Engineer's Estimate: $30,250,000
Project Location: This Project is located in southwest Seattle along where Fauntleroy Creek crosses 45 th Ave SW, between SW Director St on the north and SW Wildwood Pl on the south

With GovernmentContracts, you can:
...electrical repairs, replacements, minor modifications, testing of electrical equipment, instrumentation... Abstract: Construction Solicitation ...
King County
Bid Due: 9/29/2026
...work, installation of new exterior and interior finishes, masonry work; replacement and new... ...
City of Vancouver
Bid Due: 9/29/2026
..., temporary erosion control, hot mix asphalt (HMA) paving, beam guardrail, electrical system ...
State Government of Washington
Bid Due: 9/23/2026
...REPLACEMENT, PATCHING AND REMOVAL OF EXISTING INTERIOR WALLS, CEILINGS, FINISHES, AND ELECTRICAL... 161E ...
Port of Seattle
Bid Due: 10/22/2026