| Location: | Florida |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 29, 2026 |
| Agency: | Pinellas County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0734-RFQ-DB |
| Publication URL: | To access bid details, please log in. |
Project ID: 26-0734-RFQ-DB
Title: Design and Construction of Power Distribution within the County Solid Waste Disposal Complex
Addenda: 0
Release Date: 9/1/2026
Due Date: 9/29/2026
Pinellas County, Florida (“County”) seeks to engage a qualified design-build team to develop and implement a resilient, multi-source microgrid system at the Solid Waste Disposal Complex in St. Petersburg, Florida. The microgrid will integrate power from the existing Waste-to-Energy (WTE) facility, a new floating solar array, and electric utility services to provide electricity to county facilities, enhance reliability, operational continuity, and sustainability across the site.
The County intends to select and enter into a contract with the proposer whose proposal is determined in the sole judgment of the County to be in the best interest of the County. To be eligible to enter into the Service Agreement with the County, such Proposer must continue to meet all of the Minimum Qualifications Criteria contained in this Request for Qualifications (RFQ) from the date the Statement of Qualifications is submitted until the day the Service Agreement is signed by the County.
The RFQ requests Statements of Qualifications (SOQs) from qualified companies (“Proposers”). The qualified Proposers who respond will be evaluated in accordance with the procedures and criteria set forth in this RFQ.
The Solid Waste Disposal Complex, as defined for this project, comprises multiple county-owned facilities and site utility services. Key facilities include – a Waste-to-Energy (WTE) facility, mosquito control operations, sheriff’s training facilities, and an industrial water treatment facility, administrative building, Household Hazardous Waste Center, maintenance buildings, landfill contractors' buildings, WTE administration and education center, and multiple pump stations and other electrical users – each currently served by separate electric services from Duke Energy. The County intends to consolidate and modernize its electrical infrastructure by constructing a centralized microgrid.
The Microgrid will:

With GovernmentContracts, you can:
...Description: Optimization and Improvements Design-Build Department: Water Utilities Buyer: Krystin...: Design/Build Closing Date ...
Palm Beach County
Bid Due: 1/06/2030
...Description: Optimization and Improvements Design-Build Department: Water Utilities Buyer: Krystin...: Design/Build Closing Date ...
Palm Beach County
Bid Due: 1/23/2030
...Description: Optimization and Improvements Design-Build Department: Facilities Dev & Ops Buyer...
Palm Beach County
Bid Due: 1/06/2030
...Description: WTP 8 Membrane Expansion Progressive Design-Build Department: Water Utilities Buyer...: Design/Build Closing ...
Palm Beach County
Bid Due: 7/06/2030