| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: EV CHARGER PROJECT AT THE CITY CORPORATION YARD (CIP2515)
Addenda: 0
Release Date: 4/29/2026
Due Date: 6/2/2026
In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, and connections in accordance with the contract documents, manufacturer recommendations, and PG&E requirements. The work also includes installation of any structural concrete or maintenance pads, bollards, and equipment labeling as required. This also includes the procurement and installation of the switchboard, transformer, and Panel board as approved by PG&E. Contractor shall also perform testing to demonstrate that the chargers are fully operational.

With GovernmentContracts, you can:
...Commodity: WIRING AND OTHER ELECTRICAL MAINTENANCE AND REPAIR SERVICES Description: SOFTWARE HOUSE C-CURE...
County of Los Angeles
Bid Due: 8/06/2026
...wiring, car and counterweight roller guides, car door operator, fire return system, hoistway ...
UCLA Capital Programs
Bid Due: 8/04/2026
..., Wiring Supplies, and Related Equipment Merchant Wholesalers Wholesale Trade 423830: Industrial...
City of Los Angeles
Bid Due: 7/28/2026
...Bid:No Overview Summary This project addresses network cabling, distributed antenna system wiring..., and ...
San Joaquin Delta College
Bid Due: 8/03/2026