| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: EV CHARGER PROJECT AT THE CITY CORPORATION YARD (CIP2515)
Addenda: 0
Release Date: 4/29/2026
Due Date: 6/2/2026
In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, and connections in accordance with the contract documents, manufacturer recommendations, and PG&E requirements. The work also includes installation of any structural concrete or maintenance pads, bollards, and equipment labeling as required. This also includes the procurement and installation of the switchboard, transformer, and Panel board as approved by PG&E. Contractor shall also perform testing to demonstrate that the chargers are fully operational.

With GovernmentContracts, you can:
...146167 - 146167 MOTOTRBO R5 RADIOS AND CHARGERS Status Stage Open Posted 6/2/2026 ...
City of Los Angeles
Bid Due: 6/05/2026
...Summary The City of Thousand Oaks is soliciting bids for the construction of ...
City of Thousand Oaks
Bid Due: 6/10/2026
...& accessories - Battery chargers Contact InformationJoelle Au Phone : 916/619-9079 Email...
State Government of California
Bid Due: 6/04/2026
...-powered, direct current fast chargers (DCFCs) to support light-duty EV travel along major ...
California Energy Commission
Bid Due: 10/16/2026