| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: EV CHARGER PROJECT AT THE CITY CORPORATION YARD (CIP2515)
Addenda: 0
Release Date: 4/29/2026
Due Date: 6/2/2026
In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, and connections in accordance with the contract documents, manufacturer recommendations, and PG&E requirements. The work also includes installation of any structural concrete or maintenance pads, bollards, and equipment labeling as required. This also includes the procurement and installation of the switchboard, transformer, and Panel board as approved by PG&E. Contractor shall also perform testing to demonstrate that the chargers are fully operational.

With GovernmentContracts, you can:
...Last Updated: May 18, 2026 Bid Orientation: N/A Description: Construct asphalt/concrete speed..., posts, ...
City of Stockton
Bid Due: 6/11/2026
...Last Updated: May 18, 2026 Bid Orientation: N/A Description: Construct asphalt/concrete speed cushions..., ...
City of Stockton
Bid Due: 6/04/2026
...in Pacific Time Draft Response No Bid16 days, 20 hours, 1 minutes Post ...
City of Benicia
Bid Due: 6/04/2026
...and grading, installation of approximately 60 linear feet of new concrete mow band, ...
City of Foster City
Bid Due: 6/04/2026