| Location: | California |
|---|---|
| Posted: | Apr 29, 2026 |
| Due: | Jun 2, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: EV CHARGER PROJECT AT THE CITY CORPORATION YARD (CIP2515)
Addenda: 0
Release Date: 4/29/2026
Due Date: 6/2/2026
In general, the work consists of, but is not limited to, procuring and installing the 3 dual level 2 (Autel MaxiCharger) and 1 dual level 3 (BTC Power Gen4) EV chargers. Including any required demolition, trench excavation, trench restoration, installation of conduits, wiring, and connections in accordance with the contract documents, manufacturer recommendations, and PG&E requirements. The work also includes installation of any structural concrete or maintenance pads, bollards, and equipment labeling as required. This also includes the procurement and installation of the switchboard, transformer, and Panel board as approved by PG&E. Contractor shall also perform testing to demonstrate that the chargers are fully operational.

With GovernmentContracts, you can:
...level of the building. New electrical conduits and supports will be routed from ...
UCLA Capital Programs
Bid Due: 7/28/2026
...in conduits. The District intends to relocate cabling within walls and above ceilings, ...
San Joaquin Delta College
Bid Due: 8/03/2026
...of a portion of Garden Highway pavement, installation of vacuum system and conduit, ...
DEPT OF DEFENSE
Bid Due: 9/04/2026
...of an existing concrete vault access, reconnection of flow meter power and communications ...
City of Thousand Oaks
Bid Due: 8/12/2026