| Location: | Florida |
|---|---|
| Posted: | Dec 30, 2025 |
| Due: | Jan 22, 2026 |
| Agency: | City of Sanford |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ 25/26-06 |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| Question | Date Asked | Answer | Date Answered |
| Has the city elected NOT to renew any of the current CMAR contracts from RFQ 24/25-09? In other words, if we have a contract from 24/25-09, do we need to submit under this new RFQ 25/26-06? | 12/19/2025 9:48:41 AM | No. RFQ 24/25-09 will continue. You will need to submit under RFQ 25/26-06 if you would like to be considered. | 12/23/2025 10:16:30 AM |
| Section 1.04.B.4 requires 5 years of CMAR experience with City and County governments within the State of Florida. Will the City consider amending this to accept CMAR experience from other states as an acceptable demonstration of experience? | 12/23/2025 3:22:42 PM | Awaiting response from management. | 12/29/2025 7:36:28 AM |
| Section 1.04.B.4 requires five years or equivalent experience or expertise associated with CMAR`s within Florida. What would constitute "equivalent experience or expertise"? Is this referring to other types of alternative procurement contracts? | 12/23/2025 3:26:00 PM | Awaiting response from management. | 12/29/2025 7:36:38 AM |
| The draft contract and bond file does not download a file able to be opened. Can this be re-uploaded please? | 12/24/2025 9:47:14 AM | Updated file has been uploaded. Thank you. | 12/29/2025 7:35:15 AM |
| Please clarify question #1. If we are currently under contract from RFQ 24/25-09, do we need to submit under RFQ 25/26-06? | 12/29/2025 8:21:52 AM | Yes you will need to submit under this solicitation, even if you were previously awarded a different contract. | 12/29/2025 9:05:06 AM |
|
1. What is the City`s capital improvement plan for the next +/- 5 years?
2. Can you provide a list of anticipated projects to be awarded via this RFQ selection? 2. How many CMs do you plan to select under this RFQ? 3. How is work awarded if we are selected? |
12/29/2025 11:35:36 AM | ||
| How many CM firms does the committee plan on awarding? According to Sections 5.05 and 4.09, the committee is tasked with selecting a minimum of three (3) and a maximum of six (6) of the proposals submitted for presentation. However, based on past RFQs, up to ten (10) firms were awarded for the same continuing services contract with the same RFQ language. | 12/29/2025 4:07:03 PM | ||
| How many CM firms does the committee plan on awarding? According to Sections 5.05 and 4.09, the committee is tasked with selecting a minimum of three (3) and a maximum of six (6) of the proposals submitted for presentation. However, based on past RFQs, up to ten (10) firms were awarded for the same continuing services contract with the same RFQ language. | 12/29/2025 4:25:56 PM |
| Code | Description |
| [911-58] | C.I.P., Special Consultants |
| [150-10] | Construction Materials (Not Otherwise Classified) |
| [913-27] | Construction, Highway and Road |
| [913-45] | Construction, Sewer and Storm Drain |
| [913-56] | Construction, Utility/Underground Projects |
| [913-59] | Construction and Upgrades, Wastewater Treatment Plant |
| [913-60] | Construction, Water System/Plants, Main and Service Line |
| [918-31] | Construction Consulting |
| [929-31] | Construction Equipment Maintenance and Repair (Not Otherwise Listed) |
| [940-29] | Construction, Elevated Transit Station (Including Rehab., Maintenance and Repair) |
| [958-26] | Construction Management Services |
| [909-22] | Building Construction, Non-Residential (Office Bldg., etc.) |
| [909-30] | Building Construction (Not Otherwise Classified) |
| [911-15] | C.I.P., Construction and Rehabilitation, Other than Buildings |
| [911-16] | C.I.P., Construction and Rehabilitation, Buildings |
| [911-17] | C.I.P., Construction, Roads |
| [959-90] | Waterfront Construction Services Including Piers, Docks, Decking, etc. (Includes Maintenance and Repair) |
| [988-63] | Park Area Construction/Renovation |
| [918-75] | Management Consulting |
| [208-68] | Project Management |
| [911-51] | C.I.P., Project Management and Administration |
| [925-44] | General Construction: Management, Scheduling, Cost Estimation - Engineering |
| Publication | Date |

With GovernmentContracts, you can:
...Project ID: Title: Program Management and Construction Management Services for the Airside 2 ...
The Greater Orlando Aviation Authority
Bid Due: 6/24/2026
...audio coverage, system redundancy, centralized management, integration capabilities with existing... industry best practices, ...
Orlando Sanford
Bid Due: 7/09/2026
...contractor shall provide all management, tools, equipment, and labor necessary to perform custodial... ...
DEPT OF DEFENSE
Bid Due: 7/01/2026
..., and current International Society of Arboriculture (ISA) standards and Best Management Practices ...
Brevard County School Board
Bid Due: 6/29/2026