1411845850 JEA Power Island Advanced Class Combined Cycle Facility

Location: Florida
Posted: Sep 11, 2024
Due: Dec 3, 2024
Agency: Jea
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
1411845850 JEA Power Island Advanced Class Combined Cycle Facility

JEA seeks Responses (the “Solicitation) to development of a Combined Cycle Power Generation facility at the St. Johns River Power Park. JEA is evaluating development of a Combined Cycle Power Generation facility at the St. Johns River Power Park. The facility is expected to be sized to deliver between 525 to 700 MW of net plant output using an advanced class gas turbine in a 1x1 multi shaft configuration. Cycle heat rejection will consist of a surface condenser and mechanical draft cooling tower. Duct burners shall be sized to provide an increase of 15% in STG output across the full range of ambient conditions. The maximum plant output shall be delivered under hot day ambient conditions defined herein.

The following specifications are for the design and supply of one multi shaft Power Island consisting of one advanced class H/J class Combustion Turbine Generator (CTG), a Steam Turbine Generator (STG) and a triple pressure Heat Recovery Steam Generator (HRSG). CTG shall be equipped with a Dry Low NOx (DLN) combustion system designed for firing natural gas fuel and backup fuel oil. The STG shall be configured as tandem compound reheat unit with a side exhaust dual flow or an axial exhaust LP cylinder. The triple pressure HRSG shall be a horizontal natural circulation design. All Power Island Equipment (PIE) along with associated auxiliaries shall be located outdoors and shall be provided with manufacturer’s standard weather proof acoustic enclosures.

Control systems for the CTG and STG shall be designed to interface with the Purchaser’s plant distributed control system (DCS). The facility will be operated primarily from the Purchaser furnished DCS.

The facility is located 2 miles inland, equipment design including CTG inlet air filtration shall be based on proven design concepts, which have been applied successfully in the power generation industry and met performance expectations under commercial operation for similar applications. The offered equipment shall have a minimum of 8,000 hours of cumulative operating experience at each location and a minimum of 3 different sites.

Supplier shall identify equipment which does not meet this requirement. All equipment furnished under this specification shall comply with applicable FM Global Property Loss Prevention Standards and Data Sheets. Suppliers shall confirm compliance with their proposals.

USE THIS LINK TO ACCESS THE SOLICITATION VIA ZYCUS

https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/890414/

Mandatory Pre-Response Meeting: September 23, 2024

Solicitation Due Date: December 3, 2024


1411845850 Power Island - Advanced Class Combined Cycle Facility Solicitation
1411845850 Appendix B - Minimum Qualification Form
1411845850 Appendix B - Response Form
1411845850 Appendix B – Response Workbook
1411845850 Appendix B - Conflict of Interest Form
1411845850 Appendix C - Zycus Supplier Instructions
14118454850 Appendix E - Power Island Terms and Conditions Sheet
14118454850 Attachment 1. Performance and Emissions Tables Rev0
14118454850 Attachment 2 JEA Schedule of Submittals, Bid Submittals and Technical Fill in
14118454850 Attachment 3. Performance and Emissions Tables 1111F Option Rev0
14118454850 Attachment 4. FMDS0614 HRSG
14118454850 Attachment 5. FMDS07101 Steam Turbines and Generators
14118454850 Attachment 6. FMDS1303 Steam Turbines
14118454850 Attachment 7. FMDS0754 Natural Gas
14118454850 Attachment 8. FMDS0779 Gas Turbines and Generators
14118454850 Attachment 9. FMDS1317 Gas Turbines
14118454850 Attachment 10. FMDS1704 Vibration Monitoring
14118454850 Attachment 11. Guaranteed Qty CTG
14118454850 Attachment 12. Guaranteed Qty STG
14118454850 Attachment 14. Guaranteed Qty HRSG
14118454850 Attachment 15. 16031-DS-001 Multifunction Generator Protection Relay Tripping Matrix
14118454850 Attachment 16. 16031-DS-002 Excitation Transformer Protection Relay Tripping Matrix
14118454850 Attachment 17 PCCCS Option
1411845850 - 78.4201 LTSA Term Sheet Specification






Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.