Nolte Road Booster Pump Station - WIFIA

Location: Florida
Posted: Sep 22, 2025
Due: Oct 23, 2025
Agency: Toho Water Authority
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: IFB-25-042
Publication URL: To access bid details, please log in.
Project: Nolte Road Booster Pump Station - WIFIA
Ref. #: IFB-25-042
Type: IFB
Status:
Open
Open Date: Sep 21st 2025, 8:00 AM EDT
Questions Due Date: Oct 6th 2025, 5:00 PM EDT
Close Date: Oct 23rd 2025, 2:00 PM EDT

Project Description: Tohopekaliga Water Authority (“Toho”), an independent special district established pursuant to Chapter 189, Florida Statutes, by special act of the Florida Legislature, hereby issues this Invitation for Bids (“IFB”) from qualified construction firms with the experience to construct a Booster Pump Station project (the “Project”) all-inclusive of the following:
A. Demolition: includes all activities related to the removal and clearance of existing structures and debris to prepare the site for the construction of the Project.
B. Earthwork and Erosion Control: involves site preparation and earth moving operations for the construction of the project. This includes clearing and grubbing and installation and maintenance of erosion control best management practices. Additionally, earth moving tasks include import and compaction of fill material necessary to establish finished grade.
C. Restoration and Site Work: restoration includes concrete pavements, gravel ground cover, and restoration of any impacted pavement markings, curbing, and/or sidewalks. The work also involves installation of chain link fence around the site with double 8-foot-wide swing gates.
D. Site Utilities: involves all work related to the installation of 16” DI pipe with mechanical joints, including pipe restraints for the proposed and existing water main, isolation valves, bends, fittings, line stops, bypassing system, 16” wet taps, flushing, disinfection, and testing.
E. Pump Station: involves all work related to the installation of the pump station, including two horizontal split case booster pumps (one main and one backup) with a design capacity of 2,500 GPM, suction and discharge piping and connection to the existing water main.
F. Pump Station Electrical: involves all work related to pump panels, wiring, general conduit, junctions and VFDs.
G. Site Electrical: involves all work related to the electrical distribution, including pole riser, primary service, electrical backboard, main distribution panel, site lighting, grounding, coordination between the power company to provide power to the site, connection to power and controls, generator receptacle and pole bases. As well as installation of conduit and wire for communication systems.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...-foot galvanized chainlink fence fabric with three-strand barbed wire and a 4-foot buried ...

Flagler County

Bid Due: 6/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.