| Location: | Texas |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Apr 16, 2026 |
| Agency: | City of Kyle |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: FM 1626 Transmission Main Pipeline
Addenda: 0
Release Date: 3/16/2026
Due Date: 4/16/2026
The Work consists of the installation of approximately 1.2 miles (6,300 LF) of 30-inch and 24-inch PVC pipe extending between the City’s FM1626 Pump Station site to the Well 4 Site along TXDOT and City right-of-way. Additionally, the Work includes a 16-inch and 12-inch PVC pipe across Benner Rd. to connect the Well 4 Site to the City’s water distribution system. Work will also include the installation of all necessary valving along the transmission line and several trenchless crossings under roadways.

With GovernmentContracts, you can:
Bid Information Type Invitation For Bid Status Issued Number IFB 2026-073 (Cold Laid
City of Laredo
Bid Due: 8/07/2026
Title Start Date End Date Time Left Addendums RFB #26-018 - TDEM GRANT
City of North Richland Hills
Bid Due: 8/20/2026
Project: RFP - Esoteric Testing Services Ref. #: 26/0129 Type: RFP Status: Open
Harris County
Bid Due: 8/10/2026
Project: CSP -Radiation Oncology Suite Renovation and LINAC Replacement at Smith Clinic for
Harris County
Bid Due: 8/31/2026