| Location: | California |
|---|---|
| Posted: | Jun 24, 2026 |
| Due: | Jul 21, 2026 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CITY OF MONTEREY CEMETERY PAVEMENT PRESERVATION
Addenda: 0
Release Date: 6/24/2026
Due Date: 7/21/2026
In general, the work consists of, but is not limited to, the demolition, earthwork, and construction necessary to rehabilitate the on-site road network. Pavement rehabilitation work includes the grinding of existing and placement of hot mix asphalt (HMA), preparation and compaction of existing base/subgrade materials, type II and type III slurry, the adjustment of structures to grade, the surveying and protection of monuments, and the necessary stormwater protection and traffic control.

With GovernmentContracts, you can:
...Basic Information Title Earthwork, construct soldier pile walls, & place new roadway section...
State Government of California
Bid Due: 10/07/2026
...RFB 26-27-05 Santa Fe Street Earthwork (Houston Ave to Riggin Ave) Deadline: September ...
City of Visalia
Bid Due: 9/22/2026
...RFB 26-27-05 Santa Fe Street Earthwork (Houston Ave to Riggin Ave) Deadline: September ...
City of Visalia
Bid Due: 9/22/2026
...RFB 26-27-05 Santa Fe Street Earthwork (Houston Ave to Riggin Ave) Deadline: September ...
City of Visalia
Bid Due: 9/22/2026