| Location: | California |
|---|---|
| Posted: | Jun 24, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CP25-07 |
| Publication URL: | To access bid details, please log in. |
Project Description: The construction of a 372 SF conditioned laundry room and 1095 SF non-conditioned storage building addition adjacent to the existing Medical Examiner’s office. Work includes wall demolition, grading and excavation, utility coordination, pavement removal, asphalt paving, site drainage and erosion control, concrete foundations and footings, exterior walls and structural steel, roofing system with insulation and drainage, MEP, fire protection, installation of electrical connection for mobile emergency generator, landscaping, and tree removal.

With GovernmentContracts, you can:
..., and create a scalable foundation that enables MTC staff to focus on ...
Association of Bay Area Governments
Bid Due: 1/31/2027
..., and create a scalable foundation that enables MTC staff to focus on ...
Association of Bay Area Governments
Bid Due: 3/31/2027
...Foundation and Structure Contractors Construction 423840: Industrial Supplies Merchant Wholesalers Wholesale Trade...
City of Los Angeles
Bid Due: 11/19/2026
...and install concrete street lighting standards, concrete foundations, LED luminaires, conduit...
City of Pasadena
Bid Due: 11/17/2026