| Location: | Minnesota |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation130 |
| Publication URL: | To access bid details, please log in. |
Project Description: Installation of level two electric vehicle chargers in the silver ramp on level eight. This work includes pavement marking removals, demolition of existing electric vehicle chargers, demolition of electrical infrastructure, demolition of overhead wayfinding, metal fabrications for new charger supports, conduit and electrical infrastructure to support new chargers, architectural wayfinding, pavement markings, and surface mounted delineators.

With GovernmentContracts, you can:
...fabrication and installation of distinct wire mesh caging enclosures/partitions, to include... a mandatory ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
..., is provided to clarify the required fabrication. As noted in the attachment: ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...to fabrication. The purpose of this Amendment 0001 is to: Provide official Government ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...fabrication. As noted in the attachment: Straight red lines indicate wire mesh panels ...
DEPT OF DEFENSE
Bid Due: 6/12/2026