| Location: | Utah |
|---|---|
| Posted: | Feb 19, 2026 |
| Due: | Feb 26, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CS26059 |
| Publication URL: | To access bid details, please log in. |
Project Description: INVITATIONAL
Only invited contractors listed below are allowed to attend the mandatory meeting.
Contractor Name Andersen Asphalt - Cade Andersen
Contractor Name Miller Paving - Jamen Porter
Contractor Name Post Asphalt & Construction - Jeff Post
Contractor Name Preferred Paving - Chase Collard
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
Project Description:Removal and replacement of parking lot asphalt pavement, excavation and removal of existing base and subbase to 10” below finish grade and regrading to improve drainage to storm drain collection system, place 4” of bituminous concrete mix over 6” of new aggregate base course, adjust valve boxes and storm drain sump manholes grates to finish grade and install concrete collars, and paint re-striping of parking lot
Construction Cost Estimate:$105,000.00

With GovernmentContracts, you can:
...Project: NS26-144 Heber City - 2026 Pavement Striping Ref. #: NS26-144 Department: Division... ...
State Government of Utah
Bid Due: 6/11/2026
...Project: Wasatch Peaks Ranch Road & Fire District- Road Striping Ref. #: RA26-136 ...
State Government of Utah
Bid Due: 6/15/2026
...of new striping, pavement markings, signage, signage assemblies, reconstruction of ADA ramp, crosswalk...
State Government of Utah
Bid Due: 6/09/2026
...of storm drain utilities, reconstructing ADA ramps, and striping. The site of the ...
State Government of Utah
Bid Due: 6/25/2026