30 CES - Pad Mount Transformers (2 of 2)

Location: California
Posted: May 19, 2025
Due: May 30, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: FA461025Q0034
Publication URL: To access bid details, please log in.
Follow
30 CES - Pad Mount Transformers (2 of 2)
Active
Contract Opportunity
Notice ID
FA461025Q0034
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Office
FA4610 30 CONS PK
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: May 19, 2025 07:13 am PDT
  • Original Published Date: May 14, 2025 10:35 am PDT
  • Updated Date Offers Due: May 30, 2025 01:00 pm PDT
  • Original Date Offers Due: May 30, 2025 01:00 pm PDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Jun 14, 2025
  • Original Inactive Date: Jun 14, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 6120 - TRANSFORMERS: DISTRIBUTION AND POWER STATION
  • NAICS Code:
    • 335311 - Power, Distribution, and Specialty Transformer Manufacturing
  • Place of Performance:
    Lompoc , CA 93437
    USA
Description View Changes

**Reason for updated solicitation: UPDATED pricing sheet**



Five (5) phase pad-mounted transformers shall have the following voltage ratings:

•112.5 KVA, 208Y/120, 12 kV

•150 KVA, 480Y/277, 12 kV

•300 KVA, 480Y/277, 12 kV

•500 KVA, 480Y/277, 12.47 kV

•750 KVA, 480Y/277, 12 kV

In addition, the five phase pad-mounted transformers shall meet VSFB electrical requirements below:

•All stainless-steel construction (includes tank, cabinet, base, radiators, fasteners, hinges, etc.),stainless-steel grade shall be 304L or 316L (if available).

•"Pentahead" cabinet locking mechanism/device.

•Dead-Front construction (HV-200A load break elbows with shield adapters).

•Externally clamped LV bushings with threaded copper stud for full load current below 2,100.amperes - NEMA spades shall be provided per ANSI hole requirements.

•Radial feed or Loop feed

•Frequency: 60Hz.

•Windings: HV/LV copper

•Mineral Oil-filled (Non-PCB): Type FR-3 Fluid.

•Standard impedance.

•Mild steel high-voltage/low-voltage compartment barriers.

•Cooling fins.

•Proper grounding provisions.

•Dial type gauges for oil temperature, liquid level and pressure/vacuum.

•Bay-O-Net fuses & current-limiting fuses: properly sized - additionally, the transformer shouldbe equipped with three spare fuses.

•Two-position "ON/OFF" load break primary switch

•5-position tap changer: (-5%, -2 ½ %, 0, +2 ½ %, +5%)

•Automatic pressure relief device mounted on the terminal compartment.

•Oil drain valve with sampling device, and an oil-fill/oil-level plug.

•Nameplate and NEMA safety labels: include a "UL Listed" symbol on ratings label andnameplate.

•Compliant with 2016 DOE Efficiency Standard.

•Four (4) lifting lugs.

•Entire exterior of the pad-mount transformer and terminal components shall be painted with aMunsell-Green, outdoor color-finish.

•Guaranteed to have an average coil winding temperature of 65°C rise over an average ambient airtemperature of 30°C when operated at rated voltage and load conditions.

•Provide DGA test to verify conformance to performance requirements as outlined in the latestrevisions of ANSI C57.12.00 and ANSI C57.12.90.


Attachments/Links
Contact Information
Contracting Office Address
  • ADMINISTRATIVE ONLY NO REQUISITIONS 1515 ICELAND AVE RM 150
  • VANDENBERG SFB , CA 93437-5212
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

May 14, 2025[Combined Synopsis/Solicitation (Original)] 30 CES - Pad Mount Transformers (2 of 2)
Jul 1, 2025[Award Notice (Original)] 30 CES - Pad Mount Transformers (2 of 2)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...voltage street lighting systems to low voltage by replacing 88 streetlights and 140 ...

City of Los Angeles

Bid Due: 6/17/2026

...systems, electrical branch panels, and low-voltage for the six digital signs. Minimum of ...

City of Los Angeles

Bid Due: 6/19/2026

...Mitigation Moderate and Low Risk Bid due 12/31/2099 2:00 PM Type Construction Department ...

San Francisco Public Utilities Commission

Bid Due: 12/31/2099

...; Lighting Retrofit; Low Voltage Systems Contractor; and Programmable Logic Controller (PLC) Systems...

San Francisco Public Utilities Commission

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.