| Location: | California |
|---|---|
| Posted: | Apr 25, 2025 |
| Due: | Apr 24, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9123825BA002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
See attached Bid Abstract
AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.
| Mar 5, 2025 | [Presolicitation (Original)] USACE SPK DBB Construction - Sacramento River Erosion Contract 5 Pioneer Bridge Levee Improvements- Sacramento, California |
| Mar 21, 2025 | [Solicitation (Updated)] Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements |
| Apr 2, 2025 | [Solicitation (Updated)] Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements |
| Apr 3, 2025 | [Solicitation (Updated)] Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements |
| Apr 18, 2025 | [Solicitation (Updated)] Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements |

With GovernmentContracts, you can:
Bid Detail Information Bid Number : 214027 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/29/2030
Bid Detail Information Bid Number : RFB-IS-12200418 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/28/2050
Bid Detail Information Bid Number : RFB-IS-12200418 Bid Title : SOLICITATION CANCELLED -
Los Angeles County
Bid Due: 12/28/2050
number name issue date due date Quote 17-026?? ? Quote 17-026 HUD Five
Oakland Housing Authority
Bid Due: 11/15/2026